Main Title |
Specific Site Assessment for Coal Ash Impoundments at Arizona Public Service (APS) Four Corners Power Plant, Lined Ash Impoundment, Lined Decant Water Impoundment, Fruitland, New Mexico. Draft. |
CORP Author |
GEI Consultants, Inc., Centennial, CO.; Lockheed Martin, Edison, NJ.; Environmental Protection Agency, Washington, DC. |
Year Published |
2009 |
Stock Number |
PB2010-110164 |
Additional Subjects |
Dam safety ;
Waste management ;
Surface impoundments ;
Coal ash impoundment ;
Site assessments ;
Recommendations ;
Construction ;
Operations ;
Seismology ;
Geology ;
Instrumentation ;
Structural stability ;
Maintenance ;
Operation methods ;
Ash ponds ;
Field assessments ;
New Mexico ;
Impoundment embankment dams ;
Four Corners Power Plant ;
Arizona Public Service(APS) ;
Spillway adequacy ;
Emergency action plans ;
Fruitland(New Mexico)
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB2010-110164 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
43p |
Abstract |
This report presents the results of a specific site assessment of the dam safety of Lined Ash Impoundment (LAI) embankment dam and Lined Decant Water Impoundment (LDWI) embankment dam at the Four Corners Power Plant in Fruitland, New Mexico. |