Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Environmental Topics
Laws & Regulations
About EPA
Menu
Environmental Topics
Laws & Regulations
About EPA
Related Topics:
EPA National Library Network
Contact Us
Search Results for the EPA National Library Catalog
Items Found: 14
Showing: Items 1 - 14
Your Search: (SUBJECT=Ash ponds)
Sort Results:
Publication dates (newest-oldest)
Publication dates (oldest-newest)
Title
Choose a Library:
(CTRL-CLICK for multiple libraries)
Search all libraries
Capital Group(All DC-area libraries)
AWBERC Library/Cincinnati,OH
CCTE/GLTED Library/Duluth,MN
CEMM/ACESD Library/Narragansett,RI
CEMM/EPD Library/Athens,GA
CEMM/GEMMD Library/Gulf Breeze,FL
CPHEA/PESD Library/Corvallis,OR
Env Science Center Library/Ft Meade,MD
Headquarters Library/Washington,DC
Law Library/Washington,DC
NRMRL/GWERD Library/Ada,OK
NVFEL Library/Ann Arbor, MI
OCSPP Chemical Library/Washington,DC
Region 1 Library/Boston,MA
Region 2 Library/New York,NY
Region 3 Library/Philadelphia, PA
Region 4 Library/Atlanta,GA
Region 5 Library/Chicago,IL
Region 6 Library/Dallas,TX
Region 8 Technical Library/Denver,CO
Region 9 Library/San Francisco,CA
Region 10 Library/Seattle,WA
Research Triangle Park Library/RTP, NC
Choose a Collection:
(CTRL-CLICK for multiple collections)
Search all collections
books
documents
journals
reference
audiovisual
ebooks
Select Item
Title
Year Published
1
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service, Cholla Power Plant. Draft Final.
2009
2
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service: Cholla Power Plant.
2009
3
Coal Ash Impoundment Specific Site Assessment Report: PPL Montana, Colstrip Power Plant, Units 1 and 2 Bottom Ash Ponds; Units 1 and 2 'A' Fly Ash Pond; Units 1 and 2 Stage Two Evaporation Pond (STEP); and Units 3 and 4 Effluent Holding Ponds. Draft.
2009
4
Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam.
2009
5
Coal Ash Impoundment--Specific Site Assesment Report, Tri-State Generation and Transmission Association. Escalante Generating Station.
2009
6
Dam Safety Assessment of CCW Impoundments. Possum Point Power Station. Final Report.
2010
7
Design of a monitoring program for ash pond effluents /
1979
8
Mercury Residues in Soil Around a Large Coal-Fired Power Plant.
1979
9
Specific Site Assessment for Coal Ash Impoundments at Arizona Public Service (APS) Four Corners Power Plant, Lined Ash Impoundment, Lined Decant Water Impoundment, Fruitland, New Mexico. Draft.
2009
10
Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft.
2009
11
Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, Arizona. Draft Final.
2009
12
Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, AZ. Final Report.
2009
13
Specific Site Assessment for Coal Combustion Waste Impoundments at Duke Energy Indiana (DEI) Gibson Generating Station, Owensville, Indiana.
2010
14
Specific Site Assessment Report: Tri-State Generation and Transmission Association, Escalante Generation Station. Draft.
2009
Save, Print or Email Selected Records
Select Records
Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
Select Format
Text (Brief Information)
Text (Full Information)
Endnote (Endnote Import)
ASCII delimited for EXCEL
Email Address:
(if applicable)