Search Results for the EPA National Library Catalog

Items Found: 37
Showing: Items 1 - 37
Your Search: (SUBJECT=Structural stability)


 
 
 
Select Item Title Year Published
Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Eagle Valley Generating Station. 2010
Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Harding Street Generating Station. 2010
Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Petersburg Generating Station. 2010
Assessment of Dam Safety of Coal Combustion Surface Impoundments: American Electric Power Cardinal Power Plant Brilliant, OH. (Final Report). 2009
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service, Cholla Power Plant. Draft Final. 2009
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service: Cholla Power Plant. 2009
Coal Ash Impoundment Specific Site Assessment Report: PPL Montana, Colstrip Power Plant, Units 1 and 2 Bottom Ash Ponds; Units 1 and 2 'A' Fly Ash Pond; Units 1 and 2 Stage Two Evaporation Pond (STEP); and Units 3 and 4 Effluent Holding Ponds. Draft. 2009
Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report). 2009
Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station PPL Generation, Bangor, Pennsylvania. Final Report. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft. 2009
Coal Combustion Waste Impoundment Task 3 - Dam Assessment Report. John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Final Report. 2009
Contribution to the Lateral Stability of Plane Frameworks with Two Chords and Arbitrary Lateral Supports or of I Girders with Deformable Cross Section. 1969
Dam Safety Assessment of CCW Impoundments Sikeston Power Station. 2010
Design of hazardous mechanical structures, systems and components for extreme loads / 2006
Effects of deterioration on safety and reliability of structures : proceedings of a session sponsored by the Structural Division of the American Society of Civil Engineers in conjunction with the ASCE Convention in Seattle, Washington, April 10, 1986 / 1986
Evaluating tradeoffs between hazard-resistance and environmental impacts : a multi-criteria approach to building design and life cycle performance / 2017
Lower Ash Pond Dam--A.B. Brown Station Assessment Report. 2009
Specific Site Assessment for Coal Ash Impoundments at Arizona Public Service (APS) Four Corners Power Plant, Lined Ash Impoundment, Lined Decant Water Impoundment, Fruitland, New Mexico. Draft. 2009
Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft. 2009
Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, Arizona. Draft Final. 2009
Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, AZ. Final Report. 2009
Specific Site Assessment Report: Tri-State Generation and Transmission Association, Escalante Generation Station. Draft. 2009
Torsional Measurements of Satellite Booms. 1971
Upper Ash Pond Dam--A.B. Brown Station Assessment Report. 2009

Save, Print or Email Selected Records