Main Title |
Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft. |
CORP Author |
GEI Consultants, Inc., Centennial, CO.; Lockheed Martin, Edison, NJ.; Environmental Protection Agency, Washington, DC. |
Year Published |
2009 |
Stock Number |
PB2010-110166 |
Additional Subjects |
Dam safety ;
Waste management ;
Surface impoundments ;
Coal ash impoundment ;
Site assessments ;
Recommendations ;
Construction ;
Operations ;
Seismology ;
Geology ;
Instrumentation ;
Structural stability ;
Maintenance ;
Operation methods ;
Ash ponds ;
Field assessments ;
Wyoming ;
Impoundment embankment dams ;
Jim Bridger Power Station ;
PacifiCorp Energy ;
Spillway adequacy ;
Emergency action plans ;
Point of Rocks(Wyoming)
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB2010-110166 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
42p |
Abstract |
This report presents the results of a specific site assessment of the dam safety of Flue Gas Desulphurization (FGD) Pond 1 embankment dam FGD Pond 2 embankment dam at the PacifiCorp Energy Jim Bridger Power Station in Point of Rocks, Wyoming. The specific site assessment was conducted on June 9 and 10, 2009. |