Main Title |
Manual of procedures and criteria for inspecting the installation of flexible membrane liners in hazardous waste facilities / |
Author |
Wright, T. D. ;
Held, W. M. ;
Marsh, J. R. ;
Hovater, L. R.
|
Other Authors |
|
CORP Author |
SCS Engineers, Inc., Long Beach, CA. ;Hovater Engineers, Laguna Hills, CA.;Environmental Protection Agency, Cincinnati, OH. Hazardous Waste Engineering Research Lab. |
Publisher |
Hazardous Waste Engineering Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, |
Year Published |
1987 |
Report Number |
EPA 600-8-87-056; EPA-68-03-3247 |
Stock Number |
PB88-131313 |
OCLC Number |
17338920 |
Subjects |
Hazardous waste sites ;
Waste disposal in the ground
|
Additional Subjects |
Membranes ;
Hazardous materials ;
Earth fills ;
Linings ;
Containment ;
Manuals ;
Installing ;
Storage ;
Operations ;
Inspection ;
Recommendations ;
Polyvinyl chloride ;
Addition resins ;
Chlorine organic compounds ;
Polyvinyl chloride
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
ELBD RPS |
EPA 600-8-87-056 |
repository copy |
AWBERC Library/Cincinnati,OH |
05/31/2017 |
ERAD |
EPA 600/8-87-056 |
|
Region 9 Library/San Francisco,CA |
11/15/2012 |
NTIS |
PB88-131313 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
1 volume (various pagings) ; 28 cm |
Abstract |
Under the Hazardous and Solid Waste Amendments (HSWA) of 1984, certain landfills and surface impoundments are required to assure proper containment of wastes by use of liner systems. Proper installation of the flexible membrane liner (FML) must be followed to ensure containment of wastes. The manual is intended to assist an inspector in performing all aspects of a proper FML installation inspection. Four types of FMLs are discussed in the manual: PVC, CSPE, CPE, and HDPE. The manual addresses seven installation operations. These operations include unloading and storage of FML, preparation and maintenance of supporting surface placement of FML on the supporting surface, seaming operations, anchoring and sealing, testing, and covering the FML. |
Notes |
"December 1987." Includes bibliographical references. "Contract No. 68-03-3247"--Page ii. "EPA/600/8-87/056" |