Abstract |
This project was conducted as a contract between the City of Dover and the University of New Hampshire, with additional funding supplied by the New Hampshire Estuaries Project. The overall goal was to restore as much bottom area as possible (with available funds) of formerly productive oyster bottom in two areas, the Bellamy River and Pomeroy Cove (Piscataqua River). The restored areas were intended as a contribution to the long-term NHEP goal of restoring 20 acres of oyster bottom by 2010 (Trowbridge 2003). Five objectives were addressed: (1) site surveys, map production, and final restoration protocol development; (2) remote setting of oyster larvae; (3) bottom 'seeding' with spat; (4) assessment of restoration success; and (5) education. |