Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Environmental Topics
Laws & Regulations
About EPA
Menu
Environmental Topics
Laws & Regulations
About EPA
Related Topics:
EPA National Library Network
Contact Us
Search Results for the EPA National Library Catalog
Items Found: 58
Showing: Items 1 - 50
Your Search: (SUBJECT=Coal Wastes)
Sort Results:
Publication dates (newest-oldest)
Publication dates (oldest-newest)
Title
Choose a Library:
(CTRL-CLICK for multiple libraries)
Search all libraries
Capital Group(All DC-area libraries)
AWBERC Library/Cincinnati,OH
CCTE/GLTED Library/Duluth,MN
CEMM/ACESD Library/Narragansett,RI
CEMM/EPD Library/Athens,GA
CEMM/GEMMD Library/Gulf Breeze,FL
CPHEA/PESD Library/Corvallis,OR
Env Science Center Library/Ft Meade,MD
Headquarters Library/Washington,DC
Law Library/Washington,DC
NRMRL/GWERD Library/Ada,OK
NVFEL Library/Ann Arbor, MI
OCSPP Chemical Library/Washington,DC
Region 1 Library/Boston,MA
Region 2 Library/New York,NY
Region 3 Library/Philadelphia, PA
Region 4 Library/Atlanta,GA
Region 5 Library/Chicago,IL
Region 6 Library/Dallas,TX
Region 8 Technical Library/Denver,CO
Region 9 Library/San Francisco,CA
Region 10 Library/Seattle,WA
Research Triangle Park Library/RTP, NC
Choose a Collection:
(CTRL-CLICK for multiple collections)
Search all collections
books
documents
journals
reference
audiovisual
ebooks
1
2
NEXT
Select Item
Title
Year Published
1
Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report. PacifiCorp, Naughton Power Station, Kemmerer, Wyoming.
2009
2
Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): American Electric General James Gavin Power Plant, Cheshire, Ohio.
2009
3
Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Eagle Valley Generating Station.
2010
4
Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Harding Street Generating Station.
2010
5
Assessment of Dam Safety of Coal Combustion Surface Impoundments. Indianapolis Power and Light Company: Petersburg Generating Station.
2010
6
Assessment of Dam Safety of Coal Combustion Surface Impoundments: American Electric Power Cardinal Power Plant Brilliant, OH. (Final Report).
2009
7
Bottom Ash Pond, Trimble County Station Assessment Report. Draft Report.
2009
8
Bottom Ash Pond--Trimble County Station Assessment Report.
2009
9
CCW Impoundment Assessment Report. Bruce Mansfield Power Plant, Beaver County, Pennsylvania.
2009
10
CCW Impoundment Inspection Report: Gorgas Steam Plant, Walker County, Alabama.
2009
11
CCW Impoundments Inspection Report: Bruce Mansfield Power Plant, Beaver County, Pennsylvania. Draft Report.
2009
12
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Draft Report.
2009
13
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Final Report.
2009
14
CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Draft Report.
2009
15
CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Final Report.
2009
16
Coal Ash Impoundment--Specific Site Assesment Report Westar Energy. Jeffrey Energy Center.
2009
17
Coal Combusion Waste Impoundment Dam Assessment Report. Site 19 Wood River Power Station Dynergy Midwest Generation, Inc., Alton, Illinois (Revised).
2009
18
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft.
2009
19
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final.
2010
20
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft.
2009
21
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final.
2010
22
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft.
2009
23
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final.
2009
24
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft.
2009
25
Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report).
2009
26
Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft.
2009
27
Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft.
2009
28
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station PPL Generation, Bangor, Pennsylvania. Final Report.
2009
29
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft.
2009
30
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft.
2009
31
Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois.
2009
32
Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft.
2009
33
Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft.
2009
34
Coal Combustion Waste Impoundment Round 7-Dam Assessment Report. Ottumwa Generating Station, Ash Impoundment Dikes, Interstate Power and Light Company, Ottumwa, Iowa.
2011
35
Coal Combustion Waste Impoundment Task 3 - Dam Assessment Report. John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Final Report.
2009
36
Dam Safety Assessment of CCW Impoundments, Sunbury Generation LP.
2010
37
Dam Safety Assessment of CCW Impoundments. LG&E Mill Creek Station Report. Final Report.
2009
38
Dam Safety Assessment of CCW Impoundments. Possum Point Power Station. Final Report.
2010
39
Dam Safety Assessment of CCW Impoundments. Wabash River Generating Station.
2010
40
Dam Safety Assessment of CCW Impoundments. WH Zimmer Station.
2010
41
Dam Safety Assessment of CCW Impoundments: Bremo Power Station.
2010
42
Dam Safety Assessment of CCW Impoundments: Chesapeake Energy Center.
2010
43
Dam Safety Assessment of CCW Impoundments: Chesterfield Power Station.
2010
44
Dam Safety Assessment of CCW Impoundments: Joppa Plant.
2010
45
Dam Safety Assessment of CCW Impoundments: LG&E Mill Creek Station Report. Draft Report.
2009
46
Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Draft Report.
2009
47
Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Final Report.
2009
48
Dam Safety Inspection Report: Dan River Steam Station, Rockingham County, North Carolina. Draft Report.
2009
49
Dam Safety Inspection Report: Gorgas Steam Plant, Walker County, Alabama. Draft Report.
2009
50
Lower Ash Pond Dam, A.B. Brown Station Assessment Report. Draft Report.
2009
1
2
NEXT
Save, Print or Email Selected Records
Select Records
Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
Select Format
Text (Brief Information)
Text (Full Information)
Endnote (Endnote Import)
ASCII delimited for EXCEL
Email Address:
(if applicable)