Main Title |
Mad River Basin California. Butler Valley Project. Water Supply and Water Quality Control Study. |
CORP Author |
Federal Water Pollution Control Administration, San Francisco, Calif. Southwest Region. |
Year Published |
1967 |
Stock Number |
PB-215 104 |
Additional Subjects |
( Mad River basin ;
Water pollution) ;
( Water supply ;
Mad River basin) ;
( California ;
Water supply) ;
Humbolt County(California) ;
Trinity County(California)
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB-215 104 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
45p |
Abstract |
A study was made which discloses that municipal and industrial water supply needs in the Mad River Basin, the Eureka Plain and the adjacent communities will increase from 81,000 acre-feet in 1970 to 244,000 acre-feet/year by 2070. The benefits of providing for water needs above the capacity of existing water supplies total $18,000,000 and have a present annual equivalent value of $680,000 per year including operation and maintenance costs. Minimum stream flows required for the existing fishery will be adequate to maintain water quality in the Mad River and therefore, storage in the proposed reservoir for stream flow regulation for water quality control is not required. (Author) |
Supplementary Notes |
Sponsored in part by Corp of Engineers, San Francisco, Calif. |
PUB Date Free Form |
May 67, |
Category Codes |
13B; 68D |
NTIS Prices |
PC E02/MF A01 |
Document Type |
NT |
Cataloging Source |
NTIS/MT |
Control Number |
326540122 |
Origin |
NTIS |
Type |
CAT |