Main Title |
Final environmental impact statement supplement for Chambers Creek Interceptor, Pierce County, Washington |
CORP Author |
Environmental Protection Agency, Seattle, WA. Region X. |
Publisher |
U.S. Environmental Protection Agency, Region X, |
Year Published |
1981 |
Report Number |
EPA-910-9-81-082 |
Stock Number |
PB81-176661 |
OCLC Number |
32983894 |
Subjects |
Sewerage--Environmental aspects--Washington (State)--Pierce County ;
Environmental impact statements--Washington (State)--Pierce County ;
Sewage disposal plants--Environmental aspects--Washington (State)--Pierce County
|
Additional Subjects |
Sewage treatment ;
Sewers ;
Environmental impact statements-draft ;
Construction ;
Water tunnels ;
Ground water ;
Water quality ;
Noise pollution ;
Land use ;
Tunneling(Excavation) ;
Solid waste disposal ;
Roads ;
Traffic ;
Washington(State) ;
Pierce County(Washington)
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
ESAD |
EPA 910-9-81-082 Final |
2 copies |
Region 10 Library/Seattle,WA |
09/29/2016 |
ESAD |
EPA 910-9-81-082 Supplemental Draft |
2 copies |
Region 10 Library/Seattle,WA |
09/29/2016 |
NTIS |
PB81-176661 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
102 p. : maps ; 28 cm. |
Abstract |
During 1975 Pierce County, Washington and the U.S. Environmental Protection Agency prepared separate environmental impact statements for the Chambers Creek sewerage system. Since that time, the project as proposed in those documents proceeded in various stages of development. The design and construction of the main sewer interceptor into the treatment facility was to coincide with the design and construction schedule for the treatment plant. However, preliminary soil investigations revealed that the proposed interceptor route was unsuitable due to unstable soils conditions. Because of those findings, a tunneling alternative was suggested. This supplemental environmental impact statement examines the impacts associated with the new tunnel alternative. |
Notes |
"PB81-176661" |
Place Published |
Seattle, Wash. : |
Supplementary Notes |
Prepared in cooperation with Jones and Stokes Associates, Inc., Sacramento, CA. |
Corporate Au Added Ent |
United States. Environmental Protection Agency. Region X. ; Jones and Stokes Associates. ; United States. Environmental Protection Agency. Region X. ; Jones and Stokes Associates. |
Alternate Title |
Environmental impact statement supplement final: Chambers Creek Interceptor, Pierce County, Washington. |
PUB Date Free Form |
1981. |
NTIS Prices |
PC A05/MF A01 |
BIB Level |
m |
Cataloging Source |
OCLC/T |
OCLC Time Stamp |
19950814141607 |
Language |
ENG |
Origin |
OCLC |
Type |
MERGE |
OCLC Rec Leader |
01201nam 2200253Ia 45010 |