Main Title |
Determination of atmospheric phosphorus addition to Lake Michigan / |
Author |
Eisenreich, S. J., ;
Emmling, P. J. ;
Beeton, A. M.
|
Other Authors |
|
CORP Author |
Wisconsin Univ.-Milwaukee. Center for Great Lakes Studies.;Environmenal Research Lab.-Duluth, MN. |
Publisher |
Environmental Research Laboratory--Duluth, Office of Research and Development, U.S. Environmental Protection Agency, |
Year Published |
1980 |
Report Number |
EPA 600-3-80-063; EPA-R-803238 |
Stock Number |
PB80-219124 |
OCLC Number |
07038286 |
Subjects |
Water--Phosphorus content ;
Water--Pollution--Michigan, Lake ;
Precipitation (Chemistry) ;
Lake Michigan
|
Additional Subjects |
Precipitation(Meteorology) ;
Phosphorus ;
Pollution ;
Lake Michigan ;
Rainfall ;
Buoys ;
Urban areas ;
Rural areas ;
Seasonal variations ;
Atmospheric loading ;
Dryfall
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EHAM |
QP82.2.P6E2, 600, 1980, no.063 |
|
Region 1 Library/Boston,MA |
04/29/2016 |
EJBD |
EPA 600-3-80-063 |
|
Headquarters Library/Washington,DC |
01/23/2020 |
ELBD ARCHIVE |
EPA 600-3-80-063 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ELBD |
EPA 600-3-80-063 |
|
AWBERC Library/Cincinnati,OH |
04/10/1998 |
ELDD |
EPA-600/3-80-063 |
|
CCTE/GLTED Library/Duluth,MN |
08/23/2002 |
NTIS |
PB80-219124 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
viii, 52 pages : illustrations, figures, maps, tables ; 28 cm. |
Abstract |
Bulk precipitation was collected on a monthly basis in the Lake Michigan basin for 18 months during 1975-1976 to determine atmospheric P loadings to Lake Michigan. The sampling network consisted of bulk collectors at 23 land stations and 2 in-lake buoys located off urban and rural areas. Annual TP loading to Lake Michigan for 1976 based on loading rates of 0.184 and 0.303 micrograms/sq cm/mo for the north and south basins, respectively was 1.69x10 to the 6th power kb/year, representing approx. 16% of the total P budget. North and south basins showed different TP loading properties with approx. 62% depositing in the south basin. Seasonal variations in loading rates showed maxima in late spring and early summer, and minima in winter. |
Notes |
"July 1980." "Project Officer: Michael D. Mullin." Includes bibliographical references (pages 38-40). "Grant No. R 803238." |