Main Title |
Estimating Staffing and Cost Factors for Small Wastewater Treatment Plants Less Than 1 MGD. Part II. Estimating Costs of Package Wastewater Treatment Plants. |
Author |
Lamp, Jr., George E. ;
Baumann, E. Robert ;
McRoberts, Keith L. ;
Smith., C. E. ;
|
CORP Author |
Iowa State Univ., Ames.;Environmental Protection Agency, Washington, D.C. Office of Water Program Operations. |
Year Published |
1973 |
Report Number |
EPA-5P2-WP-195-0452; |
Stock Number |
PB-259 513 |
Additional Subjects |
Sewage treatment ;
Cost analysis ;
Municipalities ;
Industrial plants ;
Classifications ;
Operating costs ;
Cost engineering ;
Manufacturers ;
Estimates ;
Tables(Data) ;
Capitalized costs ;
Regression analysis ;
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB-259 513 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
106p |
Abstract |
Effective and efficient wastewater treatment is a function of both the quality of treatment and the cost of treatment. Although the actual quality and cost of treatment cannot be known until after a plant is in operation, estimates of both are needed at various times during the process of planning and designing a wastewater treatment system. The report describes costs, cost factors, data from manufacturers, and operating package plants. |