AERCOARE-AERMOD Alternative Model Application in Support of PSD Air Permitting - NFE Louisiana FLNG Project
Record No: 23-VI-01 Last Update: 03/29/2023
EPA Region: | 6 | Fiscal Year: | 2023 | |
States: | LA | |||
Record Type: | Action | |||
Pollutants: | Sources: | Unspecified Stationary Source,Drilling Rig | ||
Models: | OCD,AERMOD | Urban/Rural: | Rural | |
Terrain: | Essentially Flat | Regulations: | PSD | |
Guideline: | Guideline | Database: | Both | |
Oral/Written: | Written | Involvement: | Review and Comment | |
Subjects: | Technical Credibility of Nonguideline Techniques | |||
Comments: | ||||
Issue: New Fortress Energy Louisiana FLNG LLC is proposing to construct, own, and operate the New Fortress Energy (NFE) Louisiana FLNG Project, a deepwater port export terminal, approximately 16 nautical miles off the southeast coast of Grand Isle, Louisiana (West Delta Lease Block 38). The project will be considered a PSD major source, with significant emissions of NOX, CO, VOC, PM, PM10, PM2.5, SO2, H2SO4, and GHGs. As a result, air quality modeling will be conducted for NO2, CO, PM10, PM2.5, and SO2 to demonstrate compliance with the National Ambient Air Quality Standards (NAAQS) and appropriate PSD Increments. New Fortress Energy Louisiana FLNG LLC has requested to use an alternative model, as provided in Section 3.2 of the Guideline on Air Quality Models (40 CFR Part 51, Appendix W), to conduct its PSD air quality modeling analysis. Specifically, New Fortress Energy Louisiana FLNG LLC has requested to use the Coupled Ocean-Atmosphere Response Experiment (COARE) bulk flux algorithm, as implemented in the AERCOARE meteorological data preprocessor program, to prepare meteorological data for use in the American Meteorological Society/Environmental Protection Agency Regulatory Model (AERMOD) dispersion program in lieu of the preferred Offshore and Coastal Dispersion (OCD) model to assess ambient impacts in a marine environment. EPA Region 6 has conducted a thorough review of New Fortress Energy Louisiana FLNG LLC’s request and has found the proposed application of the alternative model to be satisfactory and addresses the requirements of the Guideline, Section 3.2.2(b), Condition (3), including the subsequent five elements contained in Section 3.2.2(e). As such, pursuant to the Guideline, Sections 3.0(b) and 3.2.2(a), Region 3 currently intends to approve the use of proposed coupled AERCOARE-AERMOD alternative model approach for the NFE Louisiana FLNG Project air permit application. C/H Response: The Model Clearinghouse concurs with EPA Region 6’s proposed approval of a coupled AERCOARE-AERMOD alternative modeling approach for the air quality modeling analysis required in the NFE Louisiana FLNG Project based on the alternative model request package provided by New Fortress Energy Louisiana FLNG LLC and the review documentation in the alternative model concurrence request memorandum and technical support document provided by EPA Region 6. The Model Clearinghouse encourages EPA Region 6 to respond to New Fortress Energy Louisiana FLNG LLC and to the docket for federal permitting actions related to the NFE Louisiana FLNG Project with a letter of alternative model approval, as appropriate. The information associated with the EPA Region 6 alternative model approval and the Model Clearinghouse concurrence should be available for comment during the appropriate public comment period(s). Given the possible importance of platform downwash and shoreline fumigation, the Model Clearinghouse continues to recommend caution and careful review before additional alternative model considerations of the coupled AERCOARE-AERMOD model methodology in other projects. This case- specific Model Clearinghouse concurrence does not constitute a generic approval of a coupled AERCOARE-AERMOD approach for other applications elsewhere. However, the scope of the technical assessment submitted here and with similar AERCOARE-AERMOD alternative model requests continue to provide a good basis for such considerations. |
||||
Memoranda: | ||||
Memo: Model Clearinghouse review of an alternative model application of AERCOARE in conjunction with AERMOD in support of PSD air permitting of the New Fortress Energy Louisiana FLNG Project Dated: March 29, 2023 From: George Bridgers, Model Clearinghouse Director Air Quality Modeling Group, Air Quality Assessment Division, Office of Air Quality Planning and Standards To: Ashley Mohr, Regional Air Permit Modeler Air Permits Section, Air and Radiation Division EPA Region 6, Dallas, Texas Jeffrey Robinson, Manager Air Monitoring and Grants Branch, Air and Radiation Division EPA Region 6, Dallas, Texas Memo: Concurrence Request for Approval of Alternative Model AERCOARE in Conjunction with AERMOD, in Support of Clean Air Act Permitting Effort Dated: March 1, 2023 From: Ashley Mohr, Regional Air Permit Modeler Air Permits Section, Air and Radiation Division EPA Region 6, Dallas, Texas Thru: Jeffrey Robinson, Manager Air Monitoring and Grants Branch, Air and Radiation Division EPA Region 6, Dallas, Texas To: George Bridgers, Director of Model Clearinghouse Air Quality Modeling Group, Air Quality Assessment Division, Office of Air Quality Planning and Standards Memo: Technical Review of the New Fortress Energy (NFE) Louisiana FLNG LLC request to use the AERCOARE meteorological data preprocessor program in conjunction with AERMOD in support of their Prevention of Significant Deterioration (PSD) Permit Application Dated: February 21, 2023 |