Jump to main content.


Facility Information

 
To learn more about the processes associated with this facility, click the Process List button.
You can then view pollutant information for each process.
RBLC Home New Search Search Results Facility Information Process List

Help

Date Entered:03/18/2026 Date Last Modified:04/29/2026
DRAFT

RBLC ID: VA-0336
Corporate/Company: VIRGINIA ELECTRIC AND POWER DBA DOMINION ENERGY VA
Facility Name: DOMINION CHESTERFIELD POWER STATION
Facility Description: The Dominion Chesterfield Power Station has been in operation since the 1940s, originally using steam boilers to power turbines to generate electricity. The facility shut down two coal boilers in 2019 and two other coal boilers in 2023. The facility no longer combusts coal. The facility currently operates two combined-cycle combustion turbines.

State: VA Zip Code: 23836
County: CHESTERFIELD Country: USA
EPA Region: 3    

Facility Contact Information:

Name: ROBERT SAUER
Phone: 804-273-3685 E-Mail: ROBERT.W.SAUER@DOMINIONENERGY.COM
   
       

Agency Contact Information:

             
Agency: VA001 - VIRGINIA DEPT. OF ENVIRONMENTAL QUALITY; DIVISION OF AIR QUALITY Exit EPA disclaimer
Contact: PAT CORBETT
Address: OFFICE OF AIR PERMIT PROGRAMS
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
P. O. BOX 1105
RICHMOND, VA 23218
Phone: (804)718-9967
Other Agency Contact Info: For technical information about this facility, please contact the Air Permit writer, Alison Sinclar, by phone at (804) 527-5155 or by e-mail: Alison.Sinclair@deq.virginia.gov
         EST/ACT DATE
Permit Number: 50396 Complete Application Date: ACT 09/27/2024
  Permit Issuance Date: ACT 12/19/2025
Permit Type: B: Add new process to existing facility FRS Number: 110000342530
SIC Code: 4911
NAICS Code: 221112
PERMIT URL:
 
 
             
Affected Class I / U.S. Border Area:

  Distance to Area Area Name
  -------- -------------------------
  Between 100km and 250km James River Face, VA
  Between 100km and 250km Shenandoah NP, VA
 
Facility-Wide Emission Increase/Decrease:
(After prevention/control measures)


Pollutant


Increase (+)/Decrease (-), Tons/Year

Carbon Monoxide         825.3000
Nitrogen Oxides (NOx)         353.3000
Particulate Matter (PM)         153.9000
Sulfur Oxides (SOx)         27.9000
Volatile Organic Compounds (VOC)         162.5000
 

Other Permitting Information:


The facility submitted a permit application on December 16, 2019 (revised on August 1, 2023; August 21, 2024; September 26, 2024, and March 3, 2025) to construct and operate a stationary, simple-cycle, dual fuel-fired (natural gas/distillate oil), electric power generation facility (aka Chesterfield Energy Reliability Center or CERC), operated for generation of electric power during periods of high demand, seasonal peaks, and extreme temperature events, as well as when intermittent generation sources, like solar or wind, are unavailable or insufficient to meet customer need.

Jump to main content.