Jump to main content.


Process Information - Details

 
For information about the pollutants related to this process, click on the specific pollutant in the list below.
RBLC Home New Search Search Results Facility Information Process List Process Information


Help

FINAL

RBLC ID: TX-0755
Corporate/Company: DELAWARE BASIN MIDSTREAM LLC
Facility Name: RAMSEY GAS PLANT
Process: Amine Units I and II

Primary Fuel:   
Throughput:   2000.00 GAL/MIN
Process Code:   12.390
 
 
 

Pollutant Information - List of Pollutants Help


Pollutant Primary Emission Limit Basis Verified
Hydrogen Sulfide 0 BACT-PSD UNKNOWN
Volatile Organic Compounds (VOC) 0 BACT-PSD UNKNOWN
   
Process Notes:   Combined capacity for both Units. In the amine units, lean amine solution will be fed to the amine contactor and absorbs the acid gases (H2S and CO2) in the inlet gas. The rich amine solution from the amine contactor will be flashed in the amine flash drum and routed to an amine still where acid gas is stripped from the amine solution with heat from vent gases generated from hot oil heaters. A small RTO (8MMBtu/hr) will be used to abate the amine still vent gases. Estimated destruction efficiency (DRE) for VOC and H2S by each RTO will be 99%. When RTOs are down for maintenance, emissions from the amine plants will be routed to an existing flare meeting the requirements of 40CFR 60.18. Flare operation will be limited to 288 hrs/yr.

Jump to main content.