Search Results for the EPA National Library Catalog

Items Found: 163
Showing: Items 1 - 50
Your Search: (SUBJECT=power plant)


 
 
 
1 2 3 4 NEXT
Select Item Title Year Published
Accident at the Three Mile Island nuclear powerplant : oversight hearings before a task force of the Subcommittee on Energy and the Environment of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-sixth Congress, first session on the accident at the Three Mile Island Nuclear Powerplant, Middletown, PA. 1979
Adult and juvenile fish populations near the D.C. Cook Nuclear Power Plant Southeastern Lake Michigan, during preoperational (1973-74) and operational (1975-79) years / 1985
Air pathway exposure model validation study at the Monticello Nuclear Generating Plant / 1976
Airborne cloud tracking measurements during the Three Mile Island nuclear station accident 1984
Airborne measurements of power plant plumes in West Virginia : Kammer and Mitchell power plants, 25 August-11 September 1975 / 1979
Alternatives to the Indian Point Energy Center for meeting New York electric power needs 2006
Analysis of SO2 Emission Control Alternatives for the Cabras Power Plant, Guam Power Authority. 1975
Analysis of the Three Mile Island accident and alternative sequences 1980
Answers to frequently asked questions about cleanup activities at Three Mile Island, Unit 2 1980
Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Draft Report, American Electric Power, Muskingum River Power Plant, Waterford, Ohio. 2009
Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Draft Report. American Electric Power, Cardinal Power Plant, Brilliant, Ohio. 2009
Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Draft Report. Northern States Power Company, Sherburne County Power Station, Becker, Minnesota. 2009
Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, American Electric Power, Muskingum River Power Plant, Waterford, Ohio. 2009
Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): American Electric General James Gavin Power Plant, Cheshire, Ohio. 2009
Assessment of Dam Safety Coal Combustion Surface Impoundments Draft Report. American Electric Power, General James Gavin Power Plant, Cheshire, Ohio. 2009
Assessment of Dam Safety of Coal Combustion Surface Impoundments: American Electric Power Cardinal Power Plant Brilliant, OH. (Final Report). 2009
Atmospheric diffusion experiments with SF6 tracer gas at Three Mile Island Nuclear Station under low wind speed inversion conditions / 1972
Benton Harbor Power Plant limnological studies. 0
Biomass power plant demonstration at Camp Lejeune / 1998
Capitol heat and power plant rebuild final environmental impact statement / 2010
Case study of the triad approach : expedited characterizations of petroleum constituents and PCBs using test kits and a mobile chromatography laboratory at the former Cos Cob Power Plant site / 2004
CCW Impoundment Assessment Report. Bruce Mansfield Power Plant, Beaver County, Pennsylvania. 2009
CCW Impoundments Inspection Report: Bruce Mansfield Power Plant, Beaver County, Pennsylvania. Draft Report. 2009
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Draft Report. 2009
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Final Report. 2009
Characterization of scrubbed and unscrubbed power plant plumes : three case studies. 1980
Characterization of scrubbed and unscrubbed power plant plumes {Microfiche} 1981
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service, Cholla Power Plant. Draft Final. 2009
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service: Cholla Power Plant. 2009
Coal Ash Impoundment Specific Site Assessment Report: PPL Montana, Colstrip Power Plant, Units 1 and 2 Bottom Ash Ponds; Units 1 and 2 'A' Fly Ash Pond; Units 1 and 2 Stage Two Evaporation Pond (STEP); and Units 3 and 4 Effluent Holding Ponds. Draft. 2009
Coal Ash Impoundment- Specific Site Assessment Report: Arizona Public Service, Four Corners Power Plant. 2009
Coal Combusion Waste Impoundment Dam Assessment Report. Site 19 Wood River Power Station Dynergy Midwest Generation, Inc., Alton, Illinois (Revised). 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois. 2009
Coal-fired power plant ash utilization in the TVA region / 1980
Cold weather plume study / 1986
Demonstration of Fuel Cells to Recover Energy from Anaerobic Digester Gas. Phase 1. A Conceptual Design, Preliminary Cost, and Evaluation Study. 1995
Diagnostic validation of plume models at a plains site 1984
Dispersion of sulfur dioxide from the Clinch River power plant : a wind-tunnel study / 1979
Disposal of flue gas cleaning wastes : EPA Shawnee field evaluation : second annual report / 1978
Disposal of flue gas cleaning wastes : EPA Shawnee field evaluation, initial report / 1976
Draft environmental impact statement for Ghent Generating Station, Units 3 and 4, Ghent, Kentucky / 1977
Drift data acquired on mechanical salt water cooling devices / 1975
Ecological studies in the middle reach of Chesapeake Bay, Calvert Cliffs / 1987
Ecological study of the Susquehanna River near the Three Mile Island Nuclear Station annual report for ... 1978
Effect of mechanical cooling devices on ambient salt concentration / 1976
Effects of thermal discharges on physico-chemical processes and water quality : Vistula River, Poland / 1977
Emergency planning : federal involvement in preparedness exercise at Shoreham Nuclear Plant : report to the Honorable Daniel Patrick Moynihan, United States Senate / 1986
Energy Project Review and Permitting Status Report; Colorado, Montana, North Dakota, South Dakota, Utah, Wyoming; Volume 1 Number 1 1980
Entrainment at a once-through cooling system on western Lake Erie / 1978
1 2 3 4 NEXT

Save, Print or Email Selected Records