Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Environmental Topics
Laws & Regulations
About EPA
Menu
Environmental Topics
Laws & Regulations
About EPA
Related Topics:
EPA National Library Network
Contact Us
Search Results for the EPA National Library Catalog
Items Found: 3640
Showing: Items 1001 - 1050
Your Search: (SUBJECT=Watershed)
Sort Results:
Publication dates (newest-oldest)
Publication dates (oldest-newest)
Title
Choose a Library:
(CTRL-CLICK for multiple libraries)
Search all libraries
Capital Group(All DC-area libraries)
AWBERC Library/Cincinnati,OH
CCTE/GLTED Library/Duluth,MN
CEMM/ACESD Library/Narragansett,RI
CEMM/EPD Library/Athens,GA
CEMM/GEMMD Library/Gulf Breeze,FL
CPHEA/PESD Library/Corvallis,OR
Env Science Center Library/Ft Meade,MD
Headquarters Library/Washington,DC
Law Library/Washington,DC
NRMRL/GWERD Library/Ada,OK
NVFEL Library/Ann Arbor, MI
OCSPP Chemical Library/Washington,DC
Region 1 Library/Boston,MA
Region 2 Library/New York,NY
Region 3 Library/Philadelphia, PA
Region 4 Library/Atlanta,GA
Region 5 Library/Chicago,IL
Region 6 Library/Dallas,TX
Region 8 Technical Library/Denver,CO
Region 9 Library/San Francisco,CA
Region 10 Library/Seattle,WA
Research Triangle Park Library/RTP, NC
Choose a Collection:
(CTRL-CLICK for multiple collections)
Search all collections
books
documents
journals
reference
audiovisual
ebooks
PREV
1
...
16
17
18
19
20
21
22
23
24
25
26
...
73
NEXT
Select Item
Title
Year Published
1001
Evaluation of management tools in the Occoquan watershed.
1982
1002
Evaluation of receiving water improvements from stream restoration (Accotink Creek, Fairfax City, VA) [electronic resource] /
2008
1003
Evaluation of Remote Sensing Data for Input into Hydrological Simulation Program-FORTRAN (HSPF).
1981
1004
Evaluation of rural air quality simulation models : addendum A, Muskingum River data base /
1985
1005
Evaluation of shrimp bycatch reduction devices in Texas Coastal Bend waters / demonstrating practical tools for watershed management through the National Estuary Program.
1998
1006
Evaluation of streamflow records in Yakima River basin, Washington.
1952
1007
Evaluation of surface mine reclamation techniques : Campbell's Run watershed, Pennsylvania /
1976
1008
Evaluation of the economic costs and benefits of methods for reducing nutrient loads to the Gulf of Mexico : topic 6, report for the integrated assessment on hypoxia in the Gulf of Mexico /
1999
1009
Evaluation of the ground-water resources of the lower Susquehanna River basin, Pennsylvania and Maryland /
1988
1010
Evaluation of the impact of the Mines Development, Inc. Mill on water quality conditions in the Cheyenne River /
1971
1011
Evaluation of the storage of diffuse sources of salinity in the Upper Colorado River Basin
1977
1012
Evaluation of the Watershed Protection and Flood Prevention Program
1987
1013
Evaluation of water conservation techniques in the Upper Colorado River Basin
1982
1014
Evaluation of watershed quality in the Minnesota River basin /
1994
1015
Evaluation of watershed quality in the Saginaw River Basin /
1996
1016
Executive summary : Great Lakes Basin framework study.
1977
1017
Experiments in bioregionalism : the New England river basins story
1984
1018
Experiments in small watershed response /
1972
1019
Explore our natural world : a biodiversity atlas of the Lake Huron to Lake Erie corridor /
2003
1020
EXPLORE-I : a river basin water quality model /
1973
1021
Exploring ways of increasing the use of South Platte water
1981
1022
Extent of coal mine drainage pollution, McMahon Creek watershed, Ohio.
1970
1023
External WDNR data gathering activities report
1985
1024
Extinction is not an option : statewide strategy to recover salmon : strategy.
1999
1025
Extinction is not an option : statewide strategy to recover salmon : summary.
1999
1026
Fact sheet /
2004
1027
Factors affecting nutrient trends in major rivers of the Chesapeake Bay Watershed /
2000
1028
Factors affecting the mobilization, transport, and bioavailability of mercury in reservoirs of the upper Missouri River Basin /
1987
1029
Factors affecting water quality and net flux of solutes in two stream basins in the Quabbin Reservoir drainage basin, central Massachusetts, 1983-85
1995
1030
Factors contributing to unusually low runoff during the period 1962-68 in the Concho River Basin, Texas
1970
1031
Factors contributing to unusually low runoff during the period 1962-68 in the Concho River Basin, Texas /
1972
1032
Fall line loadings of metals from the Potomac River Basin into Chesapeake Bay /
2001
1033
Farming and water quality : a handbook for the San Joaquin River basin /
1983
1034
Farming with the wind II : wind erosion and air quality control on the Columbia Plateau and Columbia Basin /
2004
1035
Fate and transport of surface water pathogens in watersheds /
2005
1036
Feasibility of financial incentives to reuse low quality waters in the Colorado River Basin
1981
1037
Feasibility of Joint Treatment in a Lake Watershed.
1969
1038
Feasibility report Schuylkill River review study, Pennsylvania, stage 2.
1980
1039
Fecal coliform TMDL modeling report : Cottonwood Creek Watershed, Idaho county, Idaho /
2000
1040
Federal participation in irrigation and use of power revenues
1979
1041
Federal waste survey : water pollution control facility, South Weymouth Naval Air Station, South Weymouth, Massachusetts, October 6, 1971, October 28, 1971, January 5, 1972.
1972
1042
Federal-interstate compact commissions : useful mechanisms for planning and managing river basin operations : report to the Congress /
1981
1043
Felton-Herron Creek, Mill Creek pilot watershed studies : semi-annual report /
0
1044
Fight for the bay : why a dark green environmental awakening is needed to save the Chesapeake Bay /
2010
1045
Final 2016 residential soil study : addendum no. 1 to the 2014 residential soil study quality assurance project plan (SRC Inc. 2014) /
2016
1046
Final environmental impact statement : proposed wastewater collection and treatment facilities, Winnipesaukee River Basin, New Hampshire.
1976
1047
Final Environmental Impact Statement for the Land and Resource Management Plan, 1997 Revision, Routt National Forest, Appendices A-J and L
1997
1048
Final Environmental Impact Statement for the Snowbird Master Development Plan, Summary
1999
1049
Final Environmental Impact Statement for the Snowbird Master Development Plan, Volume 1 and 2
1999
1050
Final Environmental impact statement on the issuance of an NPDES new source permit for Kirby Forest Industries, Inc. pulp mill near Bon Wier, Texas /
1980
PREV
1
...
16
17
18
19
20
21
22
23
24
25
26
...
73
NEXT
Save, Print or Email Selected Records
Select Records
Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
Select Format
Text (Brief Information)
Text (Full Information)
Endnote (Endnote Import)
ASCII delimited for EXCEL
Email Address:
(if applicable)