Search Results for the EPA National Library Catalog

Items Found: 4314
Showing: Items 1851 - 1900
Your Search: (SUBJECT=Power)


 
 
 
PREV 1 ... 33 34 35 36 37 38 39 40 41 42 43 ... 87 NEXT
Select Item Title Year Published
Eyewitness to power : the essence of leadership : Nixon to Clinton / 2005
Fabric filter costs for large coal-fired system generators / 1977
Fabric filter system study : first annual report / 1979
Fabric filter system study : third annual report / 1984
Fabric Filter System Study: Annual Report (2nd). 1981
Fabric Filter System Study; Fourth Annual Report. 1984
Fabric filtration analyses for three utility boiler flyashes / 1980
Fabric Filtration Analyses for Three Utility Boiler Flyashes. 1980
Fabric filtration for combustion sources : fundamentals and basic technology 1985
Face off : internal combustion engine versus the hydrogen fuel cell. 2002
Factors affecting accuracy of ichthyoplankton samples used in power plant entrainment studies / 1978
Factors affecting the use of CaF2 : Mn thermoluminescent dosimeters for low-level environmental radiation monitoring / 1976
Facts on nuclear proliferation : a handbook : prepared for the Committee on Government Operations, United States Senate / 1975
Feasibility of Alternative Cooling Systems for Power Plants in the Northern Great Plains 1974
Feasibility of alternative cooling systems for power plants in the northern Great Plains / 1974
Feasibility of Alternative Cooling Systems for Power Plants in the Northern Great Plains. 1974
Feasibility of Alternative Means of Cooling for Thermal Power Plants Near Lake Michigan. 1970
Feasibility of producing and marketing byproduct gypsum from SO2 emission control at fossil-fuel-fired power plants / 1978
Feasibility of Producing Commodities and Electricity for Space Shuttle Operations at Vandenberg Air Force Base. 1984
Feasibility of recirculating bottom ash transport water in coal-fuelled power generating stations / 1983
Feasibility of recovering useful salts from irrigation wastewater concentrates produced by power plant cooling / 1980
Feasibility of ultrasonic and other methods for direct measurement of condenser biofouling {microform} / 1984
Feasibility study for a direct, air-cooled condensation system / 1976
Feasibility Study of a Nuclear Power-Sewage Treatment System for the Conservation and Reclamation of Water Resources. 1973
Feasibility study of new sulfur oxide control processes for application to smelters and power plants / 1970
Feasibility Study of New Sulfur Oxide Control Processes for Application to Smelters and Power Plants. Part IV: The Wellman-Lord SO2 Recovery Process for Application to Power Plant Flue Gases. 1970
Feasibility study of the Kafue Gorge Lower Hydroelectri Project : feasibility report volume IV of IV appendices G through I / 1995
Feasibility study of wood-residue-fired cogeneration at Heppner, Oregon : final report 1980
Feasibility study on preparing a handbook for environmental assessment of small-scale hydroelectric development in the midwest 1998
Federal energy information sources and data bases 1979
Federal Energy Regulatory Commission annual qualifying facilities report : a cumulative listing of qualified small power production and cogeneration facilities, fiscal years 1980 through 1994 / 1994
Federal interagency energy-environment R & D program / 1977
Federal interagency energy/environment research and development program : status report 2 / 1976
Federal jurisdiction tensions in the allocation of judicial power / 1980
Federal land management Chandler Lake land exchange not in the government's best interest : report to the Chairman, Subcommittee on Water and Power Resources, Committee on Interior and Insular Affairs, House of Representatives / 1989
Federal non-nuclear energy R & D program : March 29,30, & 31, 1978, GSA Auditorium, Washington, D.C. : public hearing transcript. 1978
Federal Photovoltaic Utilization Program. Final Report of the Environmental Protection Agency. 1985
Federal R and D Plan for Air-Pollution Control by Combustion-Process Modification. 1971
Federally sponsored energy research in the Northern Great Plains : Montana, FY 1976 / 1977
Federally sponsored energy research in the Northern Great Plains, North Dakota : FY 1976 / 1977
FERC : Federal Energy Regulatory Commission / 2003
FGD installations on coal-fired plants / 1994
FGDIS Primer: Major Equipment/Component Classifications, Problem/Solution Access Codes, and Definitions Related to FGD Systems as Contained in the Flue Gas Desulfurization Information System (FGDIS). 1981
Field and laboratory studies for the development of effluent standards for the steam electric power industry / 1978
Field distribution and entrainment of fish larvae and eggs at the Donald C. Cook Nuclear Power Plant, southeastern Lake Michigan : 1973-1979 / 1984
Field Evaluation (First) of VOST and SemiVOST Methods for Selected CAAA Organic Compounds at a Coal-Fired Power Plant. 1997
Field Evaluation of a Low-NO(sub X) Firing System for Tangentially Coal-Fired Utility Boilers. 1985
Field Evaluation of a Two-Stage ESP for High Resistivity Dusts. 1980
Field evaluation of a utility dry scrubbing system / 1985
Field Evaluation of a Utility Dry Scrubbing System. 1985
PREV 1 ... 33 34 35 36 37 38 39 40 41 42 43 ... 87 NEXT

Save, Print or Email Selected Records