Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Environmental Topics
Laws & Regulations
About EPA
Menu
Environmental Topics
Laws & Regulations
About EPA
Related Topics:
EPA National Library Network
Contact Us
Search Results for the EPA National Library Catalog
Items Found: 426
Showing: Items 51 - 100
Your Search: (SUBJECT=Flood control)
Sort Results:
Publication dates (newest-oldest)
Publication dates (oldest-newest)
Title
Choose a Library:
(CTRL-CLICK for multiple libraries)
Search all libraries
Capital Group(All DC-area libraries)
AWBERC Library/Cincinnati,OH
CCTE/GLTED Library/Duluth,MN
CEMM/ACESD Library/Narragansett,RI
CEMM/EPD Library/Athens,GA
CEMM/GEMMD Library/Gulf Breeze,FL
CPHEA/PESD Library/Corvallis,OR
Env Science Center Library/Ft Meade,MD
Headquarters Library/Washington,DC
Law Library/Washington,DC
NRMRL/GWERD Library/Ada,OK
NVFEL Library/Ann Arbor, MI
OCSPP Chemical Library/Washington,DC
Region 1 Library/Boston,MA
Region 2 Library/New York,NY
Region 3 Library/Philadelphia, PA
Region 5 Library/Chicago,IL
Region 6 Library/Dallas,TX
Region 8 Technical Library/Denver,CO
Region 9 Library/San Francisco,CA
Region 10 Library/Seattle,WA
Research Triangle Park Library/RTP, NC
Choose a Collection:
(CTRL-CLICK for multiple collections)
Search all collections
books
documents
journals
reference
audiovisual
ebooks
PREV
1
2
3
4
5
6
7
8
9
NEXT
Select Item
Title
Year Published
51
Chicagoland underflow plan, Illinois : phase 1, general design memorandum
1979
52
Coal River Basin, West Virginia, Channel Rehabilitation Project : final environmental statement /
1974
53
Coastal hazards plan : with final environmental impact statement.
1981
54
Colfax Watershed, Watershed Plan - Environmental Assessment, Richland County, North Dakota (Interagency Review Draft)
1998
55
Combined sewer flooding and pollution : a national problem : the search for solutions in Chicago : report /
1979
56
Combined sewer overflow impact report /
2005
57
Comments on emergency flood control measures, task 4.5.4 : Ventura County 208 areawide water management plan, 1979-1980 / prepared by The Friends of the Ventura River.
1980
58
Community Well-Being as a Factor in Urban Land Use Planning.
1974
59
Compilation of Flood Abatement Projects in Oregon.
1971
60
Compilation of hydrologic data, Honey Creek, Trinity River Basin, Texas.
0
61
Compilation of hydrologic data, Pin Oak Creek, Trinity River Basin, Texas
0
62
Computer Program for Statistical Analysis of Annual Flood Data by the Log-Pearson Type III Method.
1971
63
Computer Simulation for Design Criteria for Urban Flow Storage Systems.
1973
64
Conceptual Framework for a Synoptic Assessment of the Prairie Pothole Region.
1996
65
Corte Madera Creek Flood Control Project Unit 4, Marin County, California
1987
66
Delineating Bordering Vegetated Wetlands Under the Massachusetts Wetlands Protection Act. A Handbook.
1995
67
Delivering timely water quality information to your community : the Jefferson Parish-Louisiana Project.
2001
68
Derivation of Hydrologic Frequency Curves.
1972
69
Descriptive water quality for the Atchafalaya Basin, Louisiana /
1980
70
Design guidelines for flood damage reduction
1981
71
Development and evaluation of a rubber "duck bill" tide gate /
1989
72
Development of a drainage and flood control management program for urbanizing communities
1978
73
Development of a flood and pollution control plan for the Chicagoland area : technical report{s} /
1972
74
Development of a flood and pollution control plan for the Chicagoland area: summary of technical reports.
1972
75
Development of an Operations Model for Montana's Water Resources: Middle Creek Reservoir Operation.
1973
76
Divine providence : the 2011 flood in the Mississippi River and Tributaries Project /
2012
77
Draft environmental impact statement : Big Creek and Metro Zoo flood and aesthetic improvement, Cleveland, Ohio /
1972
78
Draft environmental impact statement : tunnel component of the Tunnel and Reservoir Plan proposed by the Metropolitan Sanitary District of Greater Chicago : Lower Des Plaines System /
1977
79
Draft environmental statement : William L. Springer Lake, Sangamon River, Illinois.
1973
80
Draft environmental statement, recreation improvement , Cuyahoga River, Ohio
1972
81
Draft problem/objective definition
1998
82
Draft programmatic environmental impact statement/draft environmental impact report Sacramento River Flood Control System Evaluation, phases II-V /
1991
83
East Brimfield Dam and reservoir, Quinebaug River, Massachusetts and Connecticut, Thames River flood control ; design memorandum no. 1, hydrology /
1956
84
Economic analysis of flood control policy in the Sacramento-San Joaquin Delta.
1989
85
Economic Basis for Water Resources Analysis.
1968
86
Economic Criteria for Decisions on Preservation and Alteration of Natural Resources with Special Reference to Freshwater Wetlands in Massachusetts.
1973
87
Effectiveness of Flood Control Structures of the Lower Minnesota River Watershed District.
1970
88
Effects of Land Use Change on the Hydrology of an Urban Watershed.
1971
89
Emergency Outlet Plan Devils Lake, North Dakota
1996
90
Engineering and design : hydrologic frequency analysis.
1993
91
Engineering and design. Environmental engineering for local flood control channels.
1989
92
Environmental Base and Management Study - Atchafalaya Basin, Louisiana.
1975
93
Environmental base and management study : Atchafalaya Basin, Louisiana /
1975
94
Environmental flows : flood flows /
2003
95
Environmental inventory for flood damage reduction study along Turtle Creek, South Beloit, Illinois, and Beloit Wisconsin
1977
96
Environmental management in the Malibu watershed : institutional framework /
1975
97
Environmental technology verification report : soil gas sampling technology, Quadrel Services, Inc. EMFLUX(R) soil gas system /
1998
98
Envisioning futures for the Sacramento-San Joaquin Delta /
2007
99
Evaluation of Planning for Wetlands Drainage Projects in the Southeastern Coastal Plains.
1972
100
Evaluation of potential increases in Millerton Lake water supply resulting from changes in upper San Joaquin River Basin projects operation /
2000
PREV
1
2
3
4
5
6
7
8
9
NEXT
Save, Print or Email Selected Records
Select Records
Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
Select Format
Text (Brief Information)
Text (Full Information)
Endnote (Endnote Import)
ASCII delimited for EXCEL
Email Address:
(if applicable)