Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Environmental Topics
Laws & Regulations
About EPA
Menu
Environmental Topics
Laws & Regulations
About EPA
Related Topics:
EPA National Library Network
Contact Us
Search Results for the EPA National Library Catalog
Items Found: 113
Showing: Items 51 - 100
Your Search: (SUBJECT=Dam safety)
Sort Results:
Publication dates (newest-oldest)
Publication dates (oldest-newest)
Title
Choose a Library:
(CTRL-CLICK for multiple libraries)
Search all libraries
Capital Group(All DC-area libraries)
AWBERC Library/Cincinnati,OH
CCTE/GLTED Library/Duluth,MN
CEMM/ACESD Library/Narragansett,RI
CEMM/EPD Library/Athens,GA
CEMM/GEMMD Library/Gulf Breeze,FL
CPHEA/PESD Library/Corvallis,OR
Env Science Center Library/Ft Meade,MD
Headquarters Library/Washington,DC
Law Library/Washington,DC
NRMRL/GWERD Library/Ada,OK
NVFEL Library/Ann Arbor, MI
OCSPP Chemical Library/Washington,DC
Region 1 Library/Boston,MA
Region 2 Library/New York,NY
Region 3 Library/Philadelphia, PA
Region 4 Library/Atlanta,GA
Region 5 Library/Chicago,IL
Region 6 Library/Dallas,TX
Region 8 Technical Library/Denver,CO
Region 9 Library/San Francisco,CA
Region 10 Library/Seattle,WA
Research Triangle Park Library/RTP, NC
Choose a Collection:
(CTRL-CLICK for multiple collections)
Search all collections
books
documents
journals
reference
audiovisual
ebooks
PREV
1
2
3
NEXT
Select Item
Title
Year Published
51
Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam.
2009
52
Coal Ash Impoundment- Specific Site Assessment Report: Arizona Public Service, Four Corners Power Plant.
2009
53
Coal Ash Impoundment--Specific Site Assesment Report Westar Energy. Jeffrey Energy Center.
2009
54
Coal Ash Impoundment--Specific Site Assesment Report, Tri-State Generation and Transmission Association. Escalante Generating Station.
2009
55
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft.
2009
56
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final.
2010
57
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft.
2009
58
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final.
2010
59
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft.
2009
60
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final.
2009
61
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft.
2009
62
Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report).
2009
63
Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft.
2009
64
Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft.
2009
65
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station PPL Generation, Bangor, Pennsylvania. Final Report.
2009
66
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft.
2009
67
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond Progress Energy, Roxboro, North Carolina, Site 9.
2009
68
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft.
2009
69
Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft.
2009
70
Coal Combustion Waste Impoundment Dam Assessment Report: Site 7, 1982 Pond and 1964 Pond Progress Energy Carolina, Asheville, North Carolina. Project No. 0-381, Assessment of Dam Safety Coal Combustion Surface Impoundments for the REAC Program.
2009
71
Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft.
2009
72
Coal Combustion Waste Impoundment Round 7-Dam Assessment Report. Ottumwa Generating Station, Ash Impoundment Dikes, Interstate Power and Light Company, Ottumwa, Iowa.
2011
73
Coal Combustion Waste Impoundment Task 3 - Dam Assessment Report. John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Final Report.
2009
74
Dam Assessment Report (Task 3): Marshall Steam Station Coal Ash Retention Dam, Catawba County, North Carolina, Project No. 0-381. Draft Report.
2009
75
Dam safety : internal emergency action plan /
2004
76
Dam Safety Assessment of CCW Impoundments Sikeston Power Station.
2010
77
Dam Safety Assessment of CCW Impoundments, Sunbury Generation LP.
2010
78
Dam Safety Assessment of CCW Impoundments. LG&E Mill Creek Station Report. Final Report.
2009
79
Dam Safety Assessment of CCW Impoundments. Possum Point Power Station. Final Report.
2010
80
Dam Safety Assessment of CCW Impoundments. Wabash River Generating Station.
2010
81
Dam Safety Assessment of CCW Impoundments. WH Zimmer Station.
2010
82
Dam Safety Assessment of CCW Impoundments: Bremo Power Station.
2010
83
Dam Safety Assessment of CCW Impoundments: Chesapeake Energy Center.
2010
84
Dam Safety Assessment of CCW Impoundments: Chesterfield Power Station.
2010
85
Dam Safety Assessment of CCW Impoundments: Joppa Plant.
2010
86
Dam Safety Assessment of CCW Impoundments: LG&E Mill Creek Station Report. Draft Report.
2009
87
Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Draft Report.
2009
88
Dam Safety Assessment of CCW Impoundments: Reid/Green/HMP&L Station II Report. Final Report.
2009
89
Improving the safety of our Nation's dams--progress and issues : report to the Congress
1979
90
Lower Ash Pond Dam, A.B. Brown Station Assessment Report. Draft Report.
2009
91
Lower Ash Pond Dam--A.B. Brown Station Assessment Report.
2009
92
Mountaineer Bottom Ash Complex Report. Draft Report.
2009
93
Risk analysis methodology : appendix E, estimating risk of internal erosion and material transport failure modes for embankment dams /
2000
94
Round 7 Dam Assessment. Allete, Inc.-Laskin Energy Center Cells A-D and Cell E Impoundments. Final Report.
2011
95
Rules for construction and maintenance of dams adopted September 2, 1980, revised February 23, 1983, revised February 1, 1987.
1987
96
Seepage and piping /
1995
97
Specific Site Assessment for Coal Ash Impoundments at Arizona Public Service (APS) Four Corners Power Plant, Lined Ash Impoundment, Lined Decant Water Impoundment, Fruitland, New Mexico. Draft.
2009
98
Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft.
2009
99
Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, Arizona. Draft Final.
2009
100
Specific Site Assessment for Coal Combustion Waste Impoundments at Arizona Electric Power Cooperative (AEPCO) Apache Power Plant, Cochise, AZ. Final Report.
2009
PREV
1
2
3
NEXT
Save, Print or Email Selected Records
Select Records
Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
Select Format
Text (Brief Information)
Text (Full Information)
Endnote (Endnote Import)
ASCII delimited for EXCEL
Email Address:
(if applicable)