Jump to main content
US EPA
United States Environmental Protection Agency
Search
Search
Environmental Topics
Laws & Regulations
About EPA
Menu
Environmental Topics
Laws & Regulations
About EPA
Related Topics:
EPA National Library Network
Contact Us
Search Results for the EPA National Library Catalog
Items Found: 41
Showing: Items 1 - 41
Your Search: (SUBJECT=Remedial project managers)
Sort Results:
Publication dates (newest-oldest)
Publication dates (oldest-newest)
Title
Choose a Library:
(CTRL-CLICK for multiple libraries)
Search all libraries
Capital Group(All DC-area libraries)
AWBERC Library/Cincinnati,OH
CCTE/GLTED Library/Duluth,MN
CEMM/ACESD Library/Narragansett,RI
CEMM/EPD Library/Athens,GA
CEMM/GEMMD Library/Gulf Breeze,FL
CPHEA/PESD Library/Corvallis,OR
Env Science Center Library/Ft Meade,MD
Headquarters Library/Washington,DC
Law Library/Washington,DC
NRMRL/GWERD Library/Ada,OK
NVFEL Library/Ann Arbor, MI
OCSPP Chemical Library/Washington,DC
Region 1 Library/Boston,MA
Region 2 Library/New York,NY
Region 3 Library/Philadelphia, PA
Region 5 Library/Chicago,IL
Region 6 Library/Dallas,TX
Region 8 Technical Library/Denver,CO
Region 9 Library/San Francisco,CA
Region 10 Library/Seattle,WA
Research Triangle Park Library/RTP, NC
Choose a Collection:
(CTRL-CLICK for multiple collections)
Search all collections
books
documents
journals
reference
audiovisual
ebooks
Select Item
Title
Year Published
1
Air stripping of aqueous solutions.
1991
2
ARCS work assignment management field guide.
1989
3
Bioremediation in the field.
1990
4
Bioremediation: An Information Update on Applying Bioremediation to Site Cleanup.
1992
5
Contaminants and remedial options at wood preserving sites /
1992
6
Control of air emissions from materials handling during remediation.
1991
7
Developing a work scope for ecological assessments.
1992
8
EPA oversight of remedial designs and remedial actions performed by PRPs.
1990
9
Extending the tracking of analytical services to potentially responsible party : lead Superfund sites.
1992
10
FY 1992 themes for regional coordination to support continuous improvements of superfund's remedial program.
1991
11
Geo-EAS 1.2.1 : Geostatistical Environmental Assessment Software : user's guide /
1991
12
Granular activated carbon treatment.
1991
13
Guidance for data useability in risk assessment (Part A) : final.
1992
14
Guidance for data useability in risk assessment.
1992
15
Guidance for scoping the remedial design.
1995
16
Guide for conducting treatability studies under CERCLA : biodegradation remedy selection : quick reference fact sheet.
1993
17
Guide to developing Superfund no action interim action, and contingency remedy RODs /
1991
18
In situ soil flushing.
1991
19
In-situ chemical oxidation /
2006
20
Innovative treatment technologies : overview and guide to information sources.
1991
21
Issues affecting the applicability and success of remedial/removal incineration projects.
1991
22
Minimizing problems caused by staff turnover : Superfund management review: #43M, N, O.
1990
23
National meeting of remedial project managers, May 23-25, 1990, Boulder, Colorado /
1990
24
Overview of the off site policy for OSCS and RPMS (fact sheet).
1991
25
Presumptive remedies.
1992
26
Proceedings of the U.S. EPA's Forum on Remediation of Superfund Sites where Explosives are Present, December 5 and 6, 1989, San Antonio, Texas
1989
27
Real estate acquisition procedures for USACE projects.
1990
28
Remedial action report : documentation for operable unit completion.
1992
29
Remedial design/remedial action (RD/RA) handbook.
1995
30
Remedial design/remedial action handbook /
1995
31
Remedial Program Managers (RPM) EPA National Site Data (for Microcomputers).
1993
32
Risk assessment in Superfund : a primer /
1991
33
RPM (Remedial Project Manager) Primer: An Introductory Guide to the Role and Responsibilities of the Superfund Remedial Project Manager.
1987
34
Scoping the remedial design : quick reference fact sheet.
1995
35
Selection of control technologies for remediation of lead battery recycling sites /
1991
36
Selection of control technologies for remediation of lead battery recycling sites.
1992
37
Smart Moves in Superfund - Regional Initiatives. Volume 1, Number 1, February 1992.
1992
38
Superfund accelerated cleanup bulletin volume 1, number 3 : presumptive remedies for municipal landfill sites.
1992
39
Supplemental guidance to rags : calculating the concentration term.
1992
40
Technical guidance document : construction quality management for remedial action and remedial design waste containment systems.
1992
41
The role of natural resource trustees in the Superfund process.
1992
Save, Print or Email Selected Records
Select Records
Selected (this page only)
Selected (across pages)
All (this page only)
All (all pages - 500 item maximum)
Select Format
Text (Brief Information)
Text (Full Information)
Endnote (Endnote Import)
ASCII delimited for EXCEL
Email Address:
(if applicable)