Search Results for the EPA National Library Catalog

Items Found: 979
Showing: Items 101 - 150
Your Search: (SUBJECT=Production)


 
 
 
PREV 1 2 3 4 5 6 7 8 9 10 11 12 ... 20 NEXT
Select Item Title Year Published
Bureau of Mines and energy program, 1971, 1972
Business and the environment : policy incentives and corporate responses. 2007
Business process improvement : the breakthrough strategy for total quality, productivity, and competitiveness / 1991
Candles and incense as potential sources of indoor air pollution--market analysis and literature review / 2001
Capital requirements and busbar costs for power in the Ohio River basin, 1985 and 2000 1980
Case Studies on the Impact of Concentrated Animal Feeding Operations (CAFOs) on Ground Water Quality. 2012
Categorical exemption from licensing under part 1 of the Federal Power Act : for small hydroelectric power projects with an installed capacity of 5 megawatts or less / 1980
Cause-Specific Mortality among Employees of the Chevron Chemical Company Facility at Richmond with Cover Letter dated 02/08/1984. 1984
CCW Impoundment Assessment Report. Bruce Mansfield Power Plant, Beaver County, Pennsylvania. 2009
CCW Impoundment Inspection Report: Gorgas Steam Plant, Walker County, Alabama. 2009
CCW Impoundments Inspection Report: Bruce Mansfield Power Plant, Beaver County, Pennsylvania. Draft Report. 2009
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Draft Report. 2009
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Final Report. 2009
CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Draft Report. 2009
CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Final Report. 2009
Central Florida Phosphate Industry Areawide Impact Assessment Program. Volume I: Description of Program and Industry. 1978
Characterization of Nitrous Oxide Emission Sources. 1995
Characterization of sulfur recovery in oil and natural gas production / 1974
Chemical and geochemical aspects of fossil energy extraction 1983
Chemical and radiochemical analyses of water from streams, reservpors [sic], wells, and springs in the Rulison Project area, Garfield and Mesa Counties, Colorado / 1970
Chemical technology and economics in environmental perspective : Task IV - potential worker and consumer exposures to nitrilotriacetic acid (NTA) in detergents : final report / 1979
Chemicals for oil field operations : recent developments / 1981
Chemistry for energy : based on a symposium sponsored by the Chemical Institute of Canada at the annual CIC conference, Winnipeg, June 5-7, 1978 / 1979
Chesapeake Bay oyster fishery management plan : agreement commitment report revision / 1994
Chesapeake Bay Oyster Management Plan: An Agreement Commitment Report from the Chesapeake Executive Council. 1989
Chesapeake Bay Region Nutrient Management Training Manual. 1997
Chips on Triphenyl Phosphite Attachments a Thru J with Cover Letter dated 071685. 1985
Climate Change and Crop Production : Foundations for Agroecosystem Resilience / 2018
Coal Ash Impoundment--Specific Site Assesment Report Westar Energy. Jeffrey Energy Center. 2009
Coal Ash Impoundment--Specific Site Assesment Report, Tri-State Generation and Transmission Association. Escalante Generating Station. 2009
Coal Combusion Waste Impoundment Dam Assessment Report. Site 19 Wood River Power Station Dynergy Midwest Generation, Inc., Alton, Illinois (Revised). 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Ash Dam Complex, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Auxiliary Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Pond Dam, Kentukcy Utilities, Harrodsburg, Kentucky. Final. 2010
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Bottom Ash Dam, American Electric Power, St. Albans, West Virginia. Final. 2009
Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report). 2009
Coal Combustion Waste Impoundment Dam Assessment Report: 1982 Pond and 1964 Pond, Progress Energy, Asheville, North Carolina. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Havana Power Plant, Dynegy Midwest Generation, Inc., Havana, Illinois. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station PPL Generation, Bangor, Pennsylvania. Final Report. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Martins Creek Steam Electric Station, PPL Generation, Bangor, Pennsylvania. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond, Progress Energy, Roxboro, North Carolina. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Site 18 Havana Power Plant Dynegy Midwest Generation, Inc., Havana, Illinois. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Site 25, Fly Ash Pond and Bottom Ash Pond, American Electric Power, Philip Sporn Generating Plant, New Haven, West Virginia. Draft. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Wood River Power Station, Dynegy Midwest Generation, Inc., Alton, Illinois. Draft. 2009
Coal Combustion Waste Impoundment Task 3 - Dam Assessment Report. John E. Amos Plant (Site 26), Fly Ash Dam Complex, American Electric Power, St. Albans, West Virginia. Final Report. 2009
Coal Mine Siting for the Ohio River Basin Energy Study. 1981
Coastal fisheries plan. 0
PREV 1 2 3 4 5 6 7 8 9 10 11 12 ... 20 NEXT

Save, Print or Email Selected Records