Search Results for the EPA National Library Catalog

Items Found: 276
Showing: Items 1 - 50
Your Search: (SUBJECT=Dams)


 
 
 
1 2 3 4 5 6 NEXT
Select Item Title Year Published
15-meter LANDSAT analyses of the Mississippi River : map series from headwaters to the gulf of Mexico / 2003
1992 Columbia River salmon flow measures options analysis/EIS. 1992
A preliminary analysis of the thermal regime of Dworshak Reservoir / 2003
A review of aquatic habitat assessment methods / 1982
A.V. Watkins Dam safety of dams modification draft environmental assessment PRO-EA-07-002 2007
Abundance and Viability of Striped Bass Eggs Spawned in Roanoke River, North Carolina, in 1989. 1990
Abundance and Viability of Striped Bass Eggs Spawned in the Roanoke River, North Carolina in 1990. 1992
Acoustic monitoring to determine the integrity of hazardous waste dams : capsule report. 1979
Active names of bureau projects and major structures. 0
Altered hydrology of the Missouri River and its effects on floodplain forest ecosystems 1982
An assessment methodology for the environmental impact of water resource projects / 1974
An Economic Evaluation of Flood Control Alternatives in the Vermillion River Basin, South Dakota (review draft) 1998
Analysis of environmental issues related to small scale hydroelectric development, II : design considerations for passing fish upstream around dams / 1980
Analysis of existing information on ichthyoplankton drift through dams on the Upper Mississippi River 1984
Analysis of the Economics of Water Supply in the Washington Metropolitan Area. 1980
Annual report: operation of Rio Grande dams and reservoirs. 0
Application of a 1-D heat budget model to the Columbia river system / 2001
Areawide Waste Treatment and Water Quality Management Planning. Stream Use in Southern Illinois. 1980
Assessment of effect of altered stream flow characteristics on fish and wildlife : pt. B, California : final report 1977
Assessment of effects of altered stream flow characteristics on fish and wildlife : pt. A, Rocky Mountains and Pacific Northwest : executive summary 1976
Assessment of effects of altered stream flow characteristics on fish and wildlife : pt. A, Rocky Mountains and Pacific Northwest : final report 1977
Assessment of effects of altered stream flow characteristics on fish and wildlife : pt. A, Rocky Mountains and Pacific Northwest : Pacific Northwest region case studies 1977
Assessment of effects of altered stream flow characteristics on fish and wildlife : pt. A, Rocky Mountains and Pacific Northwest : Rocky Mountain region case studies 1977
Assessment of effects of altered stream flow characteristics on fish and wildlife : pt. B, California : case studies 1977
Assessment of effects of altered stream flow characteristics on fish and wildlife : pt. B, California : executive summary 1976
Assessment of hydraulic changes associated with removal of Cascade Dam, Merced River, Yosemite Valley, California 1989
Beech Fork Lake, Beech Fork of Twelvepole Creek Basin Cabell & Wayne Counties, West Virginia : final environmental impact statement / 1974
Beyond dams : options & alternatives / 2004
Bibliography on performance of dams during earthquakes / 1984
Biological Investigations of Tuttle Creek Reservoir - Kansas. 1969
Broken levees : why they failed / 2005
CCW Impoundments Inspection Report: Bruce Mansfield Power Plant, Beaver County, Pennsylvania. Draft Report. 2009
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Draft Report. 2009
CCW Impoundments Inspection Report: Mitchell Power Plant, Marshall County, West Virginia. Final Report. 2009
CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Draft Report. 2009
CCW Impoundments Inspection Report: Roxboro Steam Electric Plant, Person County, North Carolina. Final Report. 2009
Channel dynamics above gully-control structures / 1962
Chena River, The Study of a Subarctic Stream. 1970
Chesapeake Bay : removing impediments to migratory fishes. 1988
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service, Cholla Power Plant. Draft Final. 2009
Coal Ash Impoundment Specific Site Assessment Report: Arizona Public Service: Cholla Power Plant. 2009
Coal Ash Impoundment Specific Site Assessment Report: PPL Montana, Colstrip Power Plant, Units 1 and 2 Bottom Ash Ponds; Units 1 and 2 'A' Fly Ash Pond; Units 1 and 2 Stage Two Evaporation Pond (STEP); and Units 3 and 4 Effluent Holding Ponds. Draft. 2009
Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam. 2009
Coal Combustion Waste Impoundment Dam Assessment Report: Mayo Ash Pond Progress Energy, Roxboro, North Carolina, Site 9. 2009
Columbia River Basin fish and wildlife program. 2000
Comparison of instantaneous loads calculated using total and total-recoverable trace element concentration data collected at the Susquehanna River, Conowingo Dam, April 1992-1993 addendum to the fall line toxics 1992 final report / 1994
Complementary-competitive aspects of water storage : an engineering-economic approach to evaluate the extent and magnitude of the complementary and competitive aspects of water storage for water quality control / 1969
Composition and Distribution of the Fish Fauna of the Navasota River. 1972
Comprehensive Analysis of the Sediments Retained Behind Hydroelectric Dams of the Lower Susquehanna River. 2006
Contaminant Trace Element Loads at the Susquehanna River Fall Line during the Spring, 1993 High Flow Event. Addendum to the Fall Line Toxics 1992 Final Report. 1993
1 2 3 4 5 6 NEXT

Save, Print or Email Selected Records