Main Title |
Tampa Electric Company, Big Bend Unit 4. Technical Reference Document. Volume 2. |
CORP Author |
Environmental Protection Agency, Atlanta, GA. Region IV. |
Year Published |
1981 |
Report Number |
EPA-904/9-81-070B; |
Stock Number |
PB81-226235 |
Additional Subjects |
Environmental impact statements-draft ;
Electric power plants ;
Steam electric power generation ;
Water quality ;
Coal ;
Air pollution ;
Sulfur oxides ;
Nitrogen oxides ;
Tampa Bay ;
Florida ;
Coal fired power plants ;
Tampa Electric Company ;
Hillsborough County(Florida) ;
Water pollution control ;
Air pollution control ;
Air quality
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB81-226235 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
627p |
Abstract |
Tampa Electric Company proposes to construct and operate a 417 MW (NET) capacity coal-fired electric generating plant at the existing Big Bend complex adjacent to Hillsborough Bay in west-central Hillsborough County, Florida. The EIS examines project alternatives, impacts, and mitigative measures related to groundwater, air, surface water, ecological, and socioeconomic and cultural systems. Volume 2 describes the environmental of the proposed project, discusses the environmental impacts of the proposed plant as well as the mitigating measures and monitoring programs. |
Supplementary Notes |
See also Volume 1, PB81-226227. |
Availability Notes |
Also available in set of 3 reports PC E99, PB81-226201. |
NTIS Title Notes |
Draft environmental impact statement. |
PUB Date Free Form |
Jul 81 |
Category Codes |
13B; 68H |
NTIS Prices |
PC A99/MF A01 |
Primary Description |
904/00 |
Document Type |
NT |
Cataloging Source |
NTIS/MT |
Control Number |
323801276 |
Origin |
NTIS |
Type |
CAT |