Environmental Impact Statement: Henry W. Pirkey Power Plant Unit-I/South Hallsville Surface Lignite Mine Project, Harrison County, Texas. |
CORP Author |
Environmental Protection Agency, Dallas, TX. Region VI. |
Year Published |
1982 |
Report Number |
EPA-906/9-82-011; |
Stock Number |
PB83-120352 |
Additional Subjects |
Electric power plants ;
Surface mining ;
Environmental impact statements-final ;
Transmission lines ;
Lignite ;
Environmental impacts ;
Overburden ;
Construction ;
Railroads ;
Waste disposal ;
Wildlife ;
Vegetation ;
Topography ;
Texas ;
H W Pirkey electric power plant ;
Surface Lignite Mine project ;
Harrison County(Texas)
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB83-120352 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
262p |
Abstract |
Proposed projects include a 720 MW power plant, three 138 kv transmission lines, make-up water pipeline and railroad spur. The 272 acre plant island and 1,388 acre cooling reservoir have been cleared, the 100 acre railroad spur has been constructed as well as a portion of the 700 acre water pipeline. The lignite mine will cover about 20,771 acres of which about 10,545 acres will be impacted by mining. An average of 2.8 tons/year will be mined for 24 years. The reconstructed soil will consist of 6 inches of topsoil over a mixture of the remaining soil and the near-surface overburden. A minimum of 48 inches of cover will be provided over unoxidized overburden, and revegetation will use approved plant species. |
NTIS Title Notes |
Final rept. (Draft). |
PUB Date Free Form |
Sep 82 |
Category Codes |
13B; 10B; 8I; 68H; 97R; 48A |
NTIS Prices |
PC A12/MF A01 |
Primary Description |
906/00 |
Document Type |
NT |
Cataloging Source |
NTIS/MT |
Control Number |
305008210 |
Origin |
NTIS |
Type |
CAT |