Full Record Display for the EPA National Library Catalog
RECORD NUMBER: 294 OF 988Main Title | Fargo-Moorhead Metropolitan Area flood risk management : draft feasibility report and environmental impact statement / | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
CORP Author | United States. Army. Corps of Engineers. St. Paul District. | |||||||||||
Publisher | U. S. Army Corps of Engineers, St. Paul District, | |||||||||||
Year Published | 2010 | |||||||||||
OCLC Number | 637259240 | |||||||||||
Subjects | Floodplain management--North Dakota--Fargo ; Floodplain management--Minnesota--Moorhead ; Floodplain management--Red River of the North ; Flood control--North Dakota--Fargo ; Flood control--Minnesota--Moorhead ; Flood control--Red River of the North ; Water diversion--North Dakota--Fargo ; Water diversion--Minnesota--Moorhead ; Water diversion--Red River of the North ; Flood damage prevention--North Dakota--Fargo ; Flood damage prevention--Minnesota--Moorhead ; Red River of the North ; Red River Valley (Minn and ND-Man) | |||||||||||
Holdings |
|
|||||||||||
Collation | 21 v. : ill., maps, charts, plans ; 28 cm. | |||||||||||
Contents Notes | Draft feasibility report and environmental impact statement -- Appendix A-1: Hydrology, draft 26 March 2010 -- Appendix B: Hydraulics, draft report -- Appendix C: Economics, draft report -- Appendix D: Other social effects -- Appendix E: Cultural resources -- Appendix F: Environmental -- Appendix G: Real estate -- Appendix H: Credit to existing levees -- Appendix I: Geotechnical -- Appendix J: Structural -- Appendix K: Civil design -- Appendix L: Cost -- Appendix M: Recreation and aesthetics -- Appendix O: Plan formulation -- Appendix P: Non-structural -- Appendix Q: Public involvement and coordination -- Attachment I-4: Laboratory test results -- Attachment I-5: Stratigraphy for in-town levee alternative -- Fargo-Moorhead Metro Flood Risk Management Project, feasibility study, phase 2, appendix B - hydraulics, unsteady HEC-RAS modeling / Houston Engineering, Inc. -- Red River diversion, Fargo-Moorhead Metro Flood Risk Management Project, feasibility study, phase 3, report for the US Army Corps of Engineers, and the cities of Fargo, ND & Moorhead, MN / Moore Engineering, Inc., Houston Engineering, Inc., Barr Engineering Co. | |||||||||||
Place Published | St. Paul, Minn. | |||||||||||
Corporate Au Added Ent | Moore Engineering, Inc.; Houston Engineering, Inc.; Barr Engineering Company. | |||||||||||
Alternate Title | Draft feasibility report and environmental impact statement, Fargo-Moorhead Metropolitan Area flood risk management | |||||||||||
PUB Date Free Form | 2010 | |||||||||||
BIB Level | m | |||||||||||
Cataloging Source | OCLC/T | |||||||||||
OCLC Time Stamp | 20110516115921 | |||||||||||
Language | eng | |||||||||||
Origin | OCLC | |||||||||||
Type | CAT | |||||||||||
OCLC Rec Leader | 02888nam 2200409Ka 45020 |