Full Record Display for the EPA National Library Catalog

RECORD NUMBER: 429 OF 3028

Main Title Diamond Chuitna Coal Project. Final Environmental Impact Statement. Volume 1.
CORP Author Environmental Protection Agency, Seattle, WA. Region X.
Publisher Feb 90
Year Published 1990
Report Number EPA/910/9-89/011-VOL-1;
Stock Number PB90-196395
Additional Subjects Environmental impact statements-Final ; Coal mining ; Surface mining ; Licenses ; Substitutes ; Vegetation ; Fishes ; Wildlife ; Cargo ships ; Cargo transportation ; Recreational facilities ; Water quality ; Hydrology ; Oceanography ; Forecasting ; Ecology ; Diamond Chuitna Coal Project ; National Environmental Policy Act ; Wetlands ; Air quality ; Socioeconomic factors
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
NTIS  PB90-196395 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 531p
Abstract The final Environmental Impact Statement (EIS) for the Diamond Chuitna Coal Project was prepared pursuant to the National Environmental Policy Act. The actions to be considered are the approvals of federal permits for the proposed project located on the west side of Cook Inlet in south central Alaska. The project would consist of a surface coal mine, haul road, a coal conveyor loading to a port facility on Cook Inlet, dock facilities, and other ancillary facilities. Three action alternatives and a No Action Alternative are discussed in detail. Rationale for eliminating various options are given. The preferred alternative would include construction of a port site at Ladd, an eastern transportation corridor, development of a housing facility at Lone Creek, and a conveyor system which would parallel the haul road and transport coal to the port site. The impacts of the proposed project are considered in terms of vegetation, fish, wildlife, wetlands, water quality and hydrology (both surface and subsurface), physical and chemical oceanography, air quality, visual resources, cultural resources, subsistence, socioeconomics, recreation, technical feasibility and future uses of facilities. The Final EIS includes responses to comments on the Draft EIS and revisions to the Draft EIS. The Final EIS was distributed for a 30-day review period.
Supplementary Notes See also PB88-231576, and Volume 2, PB90-196403.
NTIS Title Notes Final rept.
Category Codes 68H; 48A; 57H
NTIS Prices PC A23/MF A03
Primary Description 910/00
Document Type NT
Cataloging Source NTIS/MT
Control Number 013031499
Origin NTIS
Type CAT