Full Record Display for the EPA National Library Catalog

RECORD NUMBER: 33 OF 54

Main Title Remedial conventional measures for capturing, stabilizing, or removing kepone in Bailey Bay, Bailey Creek, Gravelly Run, and the James River, Virginia : appendix B, the EPA Kepone Mitigation Feasibility Project report /
CORP Author United States. Army. Corps of Engineers. Norfolk District.; Army Engineer District, Norfolk, VA.; Environmental Protection Agency, Washington, DC. Criteria and Standards Div.
Publisher [The Corps],
Year Published 1978
Report Number 440578004B; EPA/440/5-78/004B
Stock Number PB-286 086
OCLC Number 17460580
Subjects Estuarine pollution--Control--Virginia--James River ; Chlordecone ; Kepone ; Bailey Creek (Va) ; James River (Va)
Additional Subjects Water pollution control ; Pesticides ; Cost analysis ; Substitutes ; Hydrology ; Utilization ; Chlorine organic compounds ; Bailey Bay ; Bailey Creek ; Gravelly Run ; Sites ; Dredging ; Assessments ; James River ; Virginia ; Environmental impacts ; Sediments ; Kepone ; Dredge spoil
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=91004J5D.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJAM  TD225.J1R252 Appendix B Region 3 Library/Philadelphia, PA 03/08/1991
EJDD  VA 00212 Env Science Center Library/Ft Meade,MD 03/14/1997
EKCD  EPA 440/5-78-004B CEMM/GEMMD Library/Gulf Breeze,FL 05/01/2018
NTIS  PB-286 086 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation 352 unnumbered pages in various pagings (3 folded), [92] plates in various foliations (48 folded) : illustrations ; 28 cm
Abstract This report is Appendix B of the EPA report 'Mitigation Feasibility for the Kepone-contaminated Hopewell/Jame River Areas'. The work reported in this appendix was conducted by the Norfolk District Corps of Engineers for the EPA Kepone Mitigation Feasibility Project. The appendix includes a description of: (1) analysis of world-wide dredging techniques, site surveys, and assessment of the most promising dredging techniques for removal of contaminated sediments from specific sites; (2) engineering studies to contain, stabilize or remove Kepone-contaminated sediments at points of inflow into the James River, together with an assessment of their effectiveness and potential environmental impacts; and (3) evaluation of the engineering requirements for removal of Kepone-contaminated sediments from the James River and assessment of dredge spoils sites. (Color illustrations reproduced in black and white)
Notes Cover title. "June 1978."
Place Published Norfolk, Va.
Supplementary Notes See also PB-286 085 and PB-286 087.
Availability Notes Also available in set of 4 reports PC E19, PB-286 083-SET.
Corporate Au Added Ent United States. Environmental Protection Agency. Kepone Mitigation Feasibility Project.
Alternate Title EPA Kepone Mitigation Feasibility Project report, appendix B.
PUB Date Free Form 1978
Ti Tra Differently EPA Kepone Mitigation Feasibility Project report, appendix B.
BIB Level m
Medium unmediated
Content text
Carrier volume
Cataloging Source OCLC/T
OCLC Time Stamp 20180426064717
Language eng
Origin OCLC
Type MERGE
OCLC Rec Leader 01937cam 2200385Ia 45010