Main Title |
Stone & Webster/Ionics SO2 removal and recovery process : phase I, final report / |
Other Authors |
|
CORP Author |
Wisconsin Electric Power Co., Milwaukee.;National Environmental Research Center, Research Triangle Park, N.C. Control Systems Lab. |
Publisher |
U.S. Environmental Protection Agency, Office of Research and Development, |
Year Published |
1975 |
Report Number |
PB243720; EPA-650/2-75-045; EPA-650/4-75-045; EPA-68-02-0297; EPA-ROAP-21ACX-082 |
Stock Number |
PB-243 720 |
OCLC Number |
55202740 |
Subjects |
Sulfur dioxide--Environmental aspects ;
Flue gases--Purification ;
Sulphur dioxide--Environmental aspects
|
Additional Subjects |
Sulfur dioxide ;
Air pollution control ;
Scrubbers ;
Air pollution control equipment ;
Performance evaluation ;
Pilot plants ;
Design ;
Electrolytic cells ;
Flue gases ;
Electric power plants ;
Oxidation ;
Chemisorption ;
Process charting ;
Sodium hydroxide ;
Stone and Webster/Ionics process ;
Waste gas recovery ;
Alkaline scrubbing ;
Wet methods
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EJBD |
EPA 650-2-75-045 |
|
Headquarters Library/Washington,DC |
10/02/2014 |
ELBD ARCHIVE |
EPA-650-2-75-045 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
NTIS |
PB-243 720 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
xxxi, 225 pages : illustrations ; 28 cm. |
Abstract |
The report covers Phase I of a potential three-phase program to evaluate the Stone and Webster/Ionics flue gas scrubbing process at 1 MW pilot plant scale with the option to scale up and demonstrate process viability at the 75 MW prototype level. The report cites the objectives, approach, results, and conclusions, and discusses a program that included: the design, construction, and operation of, and completion of a test program for, the pilot plant; the design, construction, and testing of prototype-size electrolytic regeneration cells; the design, engineering, and estimation of construction and operating costs of the 75 MW prototype; and preparation of a test program and operating schedule for the prototype. An executive summary includes the background and objectives of the overall program and pilot-scale effort, and highlights significant results and conclusions. Although technical feasibility was demonstrated at the pilot scale, the economics of a 75 MW prototype plant at the site of the pilot plant do not appear favorable. |
Notes |
"EPA-650/2-75-045." "May 1975." "Contract No. 68-02-0297, ROAP No. 21ACX-082, Program element No. 1AB013." "Control Systems Laboratory, National Environmental Research Center." "EPA Project Officer: Michael A. Maxwell." |
Place Published |
Research Triangle Park, NC |
Access Notes |
National Technical Information Service-- PB 243 720. |
Corporate Au Added Ent |
National Environmental Research Center (Research Triangle Park, N.C.). Control Systems Laboratory. |
Title Ser Add Ent |
Environmental monitoring series ; EPA-650/2-75-045. |
Alternate Title |
Stone & Webster/Ionics sulfur dioxide removal and recovery process; Stone & Webster/Ionics SO2 removal and recovery process : phase I, final report / |
NTIS Title Notes |
Final rept. Jul 72-Dec 74. |
PUB Date Free Form |
1975 |
Series Title Traced |
Environmental monitoring series ; EPA-650/4-75-045 |
Series Title Untraced |
Environmental monitoring series ; EPA-650/2-75-045 |
Category Codes |
07A; 68A; 99B |
NTIS Prices |
PC A10/MF A01 |
BIB Level |
m |
Medium |
unmediated |
Content |
text |
Carrier |
volume |
Cataloging Source |
OCLC/T |
Control Number |
326607220 |
OCLC Time Stamp |
20151110103000 |
Language |
eng |
Origin |
OCLC |
Type |
MERGE |
OCLC Rec Leader |
01906cam 2200421Ka 45020 |