Main Title |
Start-up of municipal wastewater treatment facilities / |
CORP Author |
Wiley and Wilson, Inc., Lynchburg, Va.;Environmental Protection Agency, Washington, D.C. Municipal Operations Branch. |
Publisher |
U.S. G.P.O., |
Year Published |
1973 |
Report Number |
EPA-430/9-74-008; EPA-68-01-0341 |
Stock Number |
PB-256 614 |
OCLC Number |
01044093 |
Subjects |
Sewage disposal plants--United States--Handbooks, manuals, etc ;
Sewage disposal plants--Handbooks, manuals, etc
|
Additional Subjects |
Sewage treatment ;
Municipalities ;
Manuals ;
Standards ;
Tests ;
Education ;
Safety ;
Manpower ;
Equipment ;
Specifications ;
Construction ;
Sewage treatment plants
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EJBD |
EPA 430-9-74-008 |
|
Headquarters Library/Washington,DC |
05/02/2013 |
ELBD ARCHIVE |
EPA 430-9-74-008 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ELBD |
EPA 430-9-74-008 |
|
AWBERC Library/Cincinnati,OH |
08/27/1999 |
ERAD |
EPA 430/9-74-008 |
|
Region 9 Library/San Francisco,CA |
09/22/1990 |
NTIS |
PB-256 614 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
viii, 92 pages ; 28 cm |
Abstract |
The manual is a guide for putting into initial operation a new municipal wastewater treatment plant, a new addition to an existing plant, or a change in the mode of a plant's operation. Information is given on preparing for actual treatment plant start-up, including; staffing the plant; developing standard operating procedures; establishing procedures when construction is continued during start-up; dry- and wetrun testing of equipment; on-site operator training; and safety training. Start-up procedures are described for some of the more common pre-treatment and primary treatment units. The start-up procedures for advanced wastewater treatment units and processes are beyond the scope of this manual. |
Notes |
"December 1973." Includes bibliographical references (pages 89-92). Sponsored by U.S. EPA Office of Water Program Operations Contract Number: 68-01-0341 |
Contents Notes |
The manual is a guide for putting into initial operation a new municipal wastewater treatment plant, a new addition to an existing plant, or a change in the mode of a plant's operation. Information is given on preparing for actual treatment plant start-up, including; staffing the plant; developing standard operating procedures; establishing procedures when construction is continued during start-up; dry- and wetrun testing of equipment; on-site operator training; and safety training. Start-up procedures are described for some of the more common pre-treatment and primary treatment units. The start-up procedures for advanced wastewater treatment units and processes are beyond the scope of this manual. |
Place Published |
Washington, |
Corporate Au Added Ent |
United States. Environmental Protection Agency. Office of Water Program Operations. Municipal Operations Branch. |
PUB Date Free Form |
1973 |
NTIS Prices |
PC A05/MF A01 |
BIB Level |
m |
Cataloging Source |
OCLC/T |
Merged OCLC records |
663723229 |
OCLC Time Stamp |
20120925132240 |
Language |
eng |
SUDOCS Number |
EP 2.8:W 28/5 |
Origin |
OCLC |
Type |
MERGE |
OCLC Rec Leader |
01212cam 2200277I 45020 |