Main Title |
Magnesia FGD process testing on a coal-fired power plant / |
Author |
Sommerer, Diane K.,
|
CORP Author |
York Research Corp., Stamford, Conn.;Industrial Environmental Research Lab., Research Triangle Park, N.C. |
Publisher |
Environmental Protection Agency, Office of Energy, Minerals, and Industry, Industrial Environmental Research Laboratory ; For sale by the National Technical Information Service, |
Year Published |
1977 |
Report Number |
EPA-600/2-77-165 |
Stock Number |
PB-272 952 |
OCLC Number |
03832199 |
ISBN |
pbk. |
Subjects |
Scrubber (Chemical technology) ;
Power-plants
|
Additional Subjects |
Electric power plants ;
Air pollution control equipment ;
Boilers ;
Combustion products ;
Scrubbers ;
Performance evaluation ;
Industrial wastes ;
Coal ;
Design criteria ;
Process charting ;
Field tests ;
Sulfur dioxide ;
Coal fired power plants ;
Magnesium oxide scrubbing ;
Venturi scrubbers
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EKBD |
EPA-600/2-77-165 |
|
Research Triangle Park Library/RTP, NC |
06/27/2003 |
ELBD ARCHIVE |
EPA 600-2-77-165 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ESAD |
EPA 600-2-77-165 |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB-272 952 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
257 pages in various pagings : illustrations ; 28 cm. |
Abstract |
The report gives results of a field measurement program to determine the operability and reliability of the Chemico magnesium oxide venturi scrubber operating at Potomac Electric Power Company's Dickerson Generating Station, Frederick, MD. A continuous source-monitoring station was installed at the scrubber, complemented by a field analytical laboratory intended for the measurement and analysis of various process streams. These facilities continuously monitored process and emission variables between October 1974 and January 1975, during August 1975. Scrubber operation was evaluated during steady-state and transient operation, the latter including startups, shutdowns, and malfunctions. During the tests, the scrubber was available about 48% of the time, including all levels of operation. Approximately 80% of system availability was steady-state, with the system operating normally. The tests showed that, although scrubber availability was not ideal (due to logistics problems in supplying raw materials (MgO), and to mechanical problems mainly attributable to under-design in such areas as piping, slurry pumps, and other auxiliary equipment), the basic scrubber concent and design should meet critical criteria once these problems are remedied. |
Notes |
Contract 68-02-1401, tasks 1, 10, 24, and 25, Program element 1AB013, ROAP 21BAV. Issued Aug. 1977. Includes bibliographical references. |
Place Published |
Research Triangle Park, N.C. Springfield, Va. |
Access Notes |
Also available via World Wide Web. |
Corporate Au Added Ent |
Industrial Environmental Research Laboratory (Research Triangle Park, N.C.); York Research Corporation. |
Corp Au Ser Add Ent |
United States. Environmental Protection Agency. Interagency energy-environment research and development program report ; EPA-600/7-77-165. |
PUB Date Free Form |
1977 |
Series Title Untraced |
Environmental protection technology series ; EPA-600/2-77-165 |
NTIS Prices |
PC A12/MF A01 |
BIB Level |
m |
Cataloging Source |
OCLC/T |
Merged OCLC records |
1060555835; 1139350155 |
OCLC Time Stamp |
20140226094827 |
Language |
eng |
SUDOCS Number |
EP 1.23/2:600/2-77-165 |
Origin |
OCLC |
Type |
CAT |
OCLC Rec Leader |
01865cam 2200397Ii 45020 |