Main Title |
Tunnel Component of the Tunnel and Reservoir Plan Proposed by the Metropolitan Sanitary District of Greater Chicago. |
CORP Author |
Environmental Protection Agency, Chicago, Ill. Region V. ;Booz-Allen and Hamilton, Inc., Bethesda, Md. |
Year Published |
1976 |
Stock Number |
PB-259 662 |
Additional Subjects |
Environmental impact statements-draft ;
Tunnels ;
Reservoirs ;
Sanitary engineering ;
Illinois ;
Chicago(Illinois) ;
Tunnel and Reservoir Plan
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB-259 662 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
484p |
Abstract |
The EIS addresses the cumulative effects of constructing and operating three conveyance tunnel systems which are part of the total Tunnel and Reservoir Plan (TARP) proposed by MSDGC. These three tunnel systems are: Mainstream (59th Street to Addison Street), Calumet, and Lower Des Plaines. Where appropriate, this statement also assesses the effects associated specifically with the Calumet Tunnel system route. Two other statements address separately the effects associated with the Mainstream Tunnel system and the Lower Des Plaines Tunnel system. The Mainstream statement has already been developed and issued, whereas the Lower Des Plaines statement is currently in the development stage. These tunnel systems comprise what is referred to in the statement as 'TARP, Phase I.' |
Supplementary Notes |
Prepared in cooperation with Booz-Allen and Hamilton, Inc., Bethesda, Md. |
NTIS Title Notes |
Draft environmental impact statement. |
PUB Date Free Form |
Jul 76 |
Category Codes |
13B |
NTIS Prices |
PC A21/MF A02 |
Document Type |
NT |
Cataloging Source |
NTIS/MT |
Control Number |
326632078 |
Origin |
NTIS |
Type |
CAT |