Main Title Estimation of small system water treatment costs /
Author Gumerman, Robert C. ; Gumerman, R. C. ; Burris, B. E. ; Hansen, S. P.
Other Authors
Author Title of a Work
Burris, Bruce E.
Hansen, Sigurd P.
CORP Author Culp/Wesner/Culp, Santa Ana, CA.;Municipal Environmental Research Lab., Cincinnati, OH.
Publisher Municipal Environmental Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency,
Year Published 1985
Report Number EPA/600/2-84/184a; PB85161644
Stock Number PB85-161644
OCLC Number 15479763
Subjects Water--Purification--Costs ; Water treatment plants--Costs
Additional Subjects Cost analysis ; Potable water ; Water pollution control ; Water treatment ; Design criteria ; Chemical engineering ; Regulations ; Construction costs ; Operating costs ; Industrial waste treatment ; Sludge disposal ; Brines ; Maintenance ; Excavation ; Concrete ; Steels ; Pipes(Tubes) ; Valves ; Electrical equipment ; Residential buildings ; Computer programs ; Field tests ; Drinking water ; Unit processes ; Small systems
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
ELBD RPS EPA 600-2-84-184a repository copy AWBERC Library/Cincinnati,OH 02/29/2016
ERAD  EPA 600/2-84-184a Region 9 Library/San Francisco,CA 11/19/2012
NTIS  PB85-161644 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation xxxiii, 567 pages : illustrations ; 28 cm
Abstract This report presents cost data for unit processes that are capable of removing contaminants included in the National Interim Primary Drinking Water Regulations. Construction and operation and maintenance cost data are presented for 45 centralized treatment unit processes that are considered to be especially applicable to contaminant removal or to the treatment and disposal of sludges or brines produced by the treatment processes. These cost data are applicable to flows up to 3,785 cu m/day (1 mgd). Cost data are also presented for five point-of-use treatment techniques. Construction and operation and maintenance costs are presented versus the most appropriate design parameter for the process. Construction costs were developed by summing the cost of eight individual categories: excavation and sitework; manufactured equipment; concrete; steel; installation labor; pipe and valves; electrical and instrumentation; and housing. Operation and maintenance requirements were determined individually for three categories: energy (building and process); maintenance material; and labor. All costs are presented in terms of December 1983, dollars, and a discussion is included on cost updating.
Notes "November 1984." "Contract no. 68-03-3093." "EPA-600/2-84-184a." Photocopy.
Place Published Cincinnati, Ohio
Supplementary Notes For system on magnetic tape, see PB85-161651.
Corporate Au Added Ent Municipal Environmental Research Laboratory.
PUB Date Free Form 1984
BIB Level m
Medium unmediated
Content text
Cataloging Source OCLC/T
OCLC Time Stamp 20160223102858
Language eng
Origin OCLC
Type MERGE
OCLC Rec Leader 01753cam 2200385Ia 45020