Full Record Display for the EPA National Library Catalog

RECORD NUMBER: 522 OF 622

Main Title Survey of flue gas desulfurization systems : Lawrence Power Station, Kansas Power and Light Co. /
Author Isaacs, G. A. ; Isaacs, Gerald A. ; Zada., Fouad K.
Other Authors
Author Title of a Work
Zada, Fouad K.
CORP Author PEDCo-Environmental Specialists, Inc., Cincinnati, Ohio.;Industrial Environmental Research Lab., Research Triangle Park, N.C.
Publisher Industrial Environmental Research Laboratory, Office of Energy, Minerals, and Industry ; For sale by the National Technical Information Service,
Year Published 1975
Report Number PB 246 849; EPA 650-2-75-057-e; EPA-68-02-1321; EPA-ROAP-21ACX-130
Stock Number PB-246 849
OCLC Number 07727440
Subjects Flue gases--Desulfurization ; Air--Pollution ; Flue gases--Desulphurization ; Desulphuration
Additional Subjects Air pollution control ; Flue gases ; Electric power plants ; Sulfur dioxide ; Limestone ; Scrubbers ; Combustion products ; Solid waste disposal ; Capitalized costs ; Boilers ; Injection ; Coal ; Calcium oxides ; Kansas ; Process charting ; Modules ; Wet method ; Marble bed scrubbers ; Spray tower scrubbers ; Limestone injection
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=9101MZR7.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBD  EPA 650-2-75-057-e Headquarters Library/Washington,DC 10/02/2014
ELBD ARCHIVE EPA-650-2-75-057-e Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
NTIS  PB-246 849 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation [38] pages : illustrations ; 28 cm.
Abstract The report gives results of a survey of the flue gas desulfurization (FGD) systems at Kansas Power and Light Co.'s Lawrence Power Station. The systems utilize boiler injection of pulverized limestone, followed by tail-end wet scrubbing: unit 4, with a net capacity of 102 MW, was retrofitted with two FGD modules and was placed in service in November 1968; and boiler 5, with a net capacity of 320 MW, and its FGD system were started up in 1971.
Notes Prepared for U.S. Environmental Protection Agency, Office of Research and Development by PEDCo-Environmental Specialists under contract no. 68-02-1321, task 6e ROAP No. 21ACX-130, program element no. 1AB013. "September 1975." "650/2-75-057-e." "PB 246 849."
Place Published Research Triangle Park, N.C. Springfield, Va.
Supplementary Notes See also PB-246 136.
Corporate Au Added Ent Industrial Environmental Research Laboratory (Research Triangle Park, N.C.); United States. Environmental Protection Agency. Office of Research and Development.; PEDCo Environmental Specialists.
Title Ser Add Ent Research reporting series. Environmental protection technology ; EPA-650/2-75-057e.
NTIS Title Notes Final rept. Aug 74-Sep 75.
PUB Date Free Form 1975
Series Title Untraced Environmental protection technology ; EPA-650/2-75-057-e
Category Codes 07A; 13B; 99B; 68A; 97
NTIS Prices PC A04/MF A01
BIB Level m
Medium unmediated
Content text
Carrier volume
Cataloging Source OCLC/T
Control Number 326611527
OCLC Time Stamp 20150109120110
Language eng
Origin OCLC
Type MERGE
OCLC Rec Leader 02181cam 2200457Ia 45020