Full Record Display for the EPA National Library Catalog

RECORD NUMBER: 18 OF 31

Main Title Mesabi Range iron ore transportation : feasibility and estimated cost of pipelining.
Author Polta, Harold J.
Publisher U.S. Dept. of the Interior, Bureau of Mines,
Year Published 1971
OCLC Number 04902685
Subjects Iron ores--Minnesota--Mesabi Range ; Iron ores--Transportation
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBM  TN23.U71 no. 8512 Headquarters Library/Washington,DC 05/18/2007
Collation 46 p. : ill. ; 26 cm.
Notes Tables. Includes bibliographical references (p. 27).
Contents Notes This Bureau of Mines publication considers the feasibility of augmenting the present transportation system by pipelining taconite concentrates from the Mesabi Range to the Chicago area. The cost of pipelining in the hypothetical system using water as the carrier is estimated to be between $3.66 and $2.97 per long ton. This appears competitive with the 1970 rail-vessel transportation rate of $4.08 even after allowing a few cents per ton for barging from the terminal to existing furnaces. Political obstacles requiring solution before such a pipeline could be built and the feasibility of using crude oil as the carrier fluid are also discussed. FORTRAN routines used to calculate unit transportation cost for specific estimated values of cost items and for a range of values are presented. The effect of deviations from estimated values of cost items on the total unit transportation cost are shown graphically.
Place Published Washington :
Corporate Au Added Ent United States. Bureau of Mines.
Title Ser Add Ent Information circular (United States. Bureau of Mines) ;
PUB Date Free Form 1971.
Series Title Untraced United States. Bureau of Mines. Information circular ; 8512
BIB Level m
Cataloging Source OCLC/T
OCLC Time Stamp 20070516165919
Language eng
SUDOCS Number I 28.27:8512
Origin OCLC
Type CAT
OCLC Rec Leader 01932cam 2200301Ii 45020