Record Display for the EPA National Library Catalog
RECORD NUMBER: 4412 OF 4800Main Title | Tampa Electric Company, Big Bend Unit 4. Technical Reference Document. Volume 2. | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
CORP Author | Environmental Protection Agency, Atlanta, GA. Region IV. | |||||||||||
Year Published | 1981 | |||||||||||
Report Number | EPA-904/9-81-070B; | |||||||||||
Stock Number | PB81-226235 | |||||||||||
Additional Subjects | Environmental impact statements-draft ; Electric power plants ; Steam electric power generation ; Water quality ; Coal ; Air pollution ; Sulfur oxides ; Nitrogen oxides ; Tampa Bay ; Florida ; Coal fired power plants ; Tampa Electric Company ; Hillsborough County(Florida) ; Water pollution control ; Air pollution control ; Air quality | |||||||||||
Holdings |
|
|||||||||||
Collation | 627p | |||||||||||
Abstract | Tampa Electric Company proposes to construct and operate a 417 MW (NET) capacity coal-fired electric generating plant at the existing Big Bend complex adjacent to Hillsborough Bay in west-central Hillsborough County, Florida. The EIS examines project alternatives, impacts, and mitigative measures related to groundwater, air, surface water, ecological, and socioeconomic and cultural systems. Volume 2 describes the environmental of the proposed project, discusses the environmental impacts of the proposed plant as well as the mitigating measures and monitoring programs. |