Main Title |
Guidelines for demonstration project quality assurance programs / |
Author |
Buchanan, James L.,
|
CORP Author |
Research Triangle Inst., Research Triangle Park, N.C.;Industrial Environmental Research Lab., Research Triangle Park, N.C. |
Publisher |
U.S. Environmental Protection Agency, Office of Research and Development ; For sale by the National Technical Information Service, |
Year Published |
1976 |
Report Number |
EPA-600/2-76-081; EPA-68-02-1398; EPA-ROAP-ABA-011 |
Stock Number |
PB-252 257 |
OCLC Number |
02351332 |
ISBN |
pbk. |
Subjects |
Air--Pollution--United States ;
Flue gases ;
Quality control
|
Additional Subjects |
Air pollution control ;
Quality control ;
Scrubbers ;
Industrial plants ;
Inventories ;
Equipment ;
Guidelines ;
Personnel ;
Industrial training ;
Reliability ;
Feedback ;
Combustion products ;
Demonstration projects ;
Limestone scrubbing
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EKBD |
EPA-600/2-76-081 |
|
Research Triangle Park Library/RTP, NC |
06/20/2003 |
ELBD ARCHIVE |
EPA 600-2-76-081 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ESAD |
EPA 600-2-76-081 |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB-252 257 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
vi, 54 pages : illustrations ; 28 cm. |
Abstract |
The report presents general guidelines for planning and implementing quality assurance programs at EPA/IERL-RTP demonstration projects. Because quality assurance, a system of activities whose purpose is to assure that overall quality is being controlled effectively, requires a thorough understanding of quality control, the report initially addresses the major components of a project quality control program, including a discussion of quality control in the request for proposal, the proposal, and the work plan. The two major functional areas of quality assurance are the qualitative systems review and the quantitative performance audit. A detailed checklist is provided to aid in the systems review, and three tables provide general information on available techniques for the performance audit. These tables cover the auditing of physical measurements, gas effluent streams, and liquid process streams. The report is designed for project officers, contractors, and others concerned with quality assurance programs at IERL-RTP demonstration projects. |
Notes |
Prepared by Research Triangle Institute, Research Triangle Park, N.C., under contract no. 68-02-1398, task 20, ROAP no. ABA-011, program element no. EHB-557. Tables. Includes appendices. Includes bibliographical references. |