Main Title |
Scoping the remedial design : quick reference fact sheet. |
CORP Author |
Environmental Protection Agency, Washington, DC. Office of Emergency and Remedial Response. |
Publisher |
United States Environmental Protection Agency, Office of Solid Waste and Emergency Response ; Distributed by National Technical Information Service, |
Year Published |
1995 |
Report Number |
EPA/540-F-95-008; OSWER Dir 9355.5-21FS; OSWER-9355.5-21FS |
Stock Number |
PB95-963305 |
OCLC Number |
37431990 |
Subjects |
Hazardous waste site remediation
|
Additional Subjects |
Superfund ;
Hazardous materials ;
Waste management ;
Project management ;
Project planning ;
Scheduling ;
Site surveys ;
Site characterization ;
Data collection ;
Remediation ;
Waste disposal ;
Waste treatment ;
Cost estimates ;
Remedial design ;
Cleanup operations ;
Superfund Accelerated Cleanup Model ;
Statement of work ;
Remedial Project Managers
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EJBD |
OSWER Dir 9355.5-21FS |
|
Headquarters Library/Washington,DC |
12/17/2014 |
ELBD RPS |
EPA 540-F-95-008 |
repository copy |
AWBERC Library/Cincinnati,OH |
05/18/2015 |
ELBD ARCHIVE |
EPA-OSWER-Dir-9355.5-21FS |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ELBD ARCHIVE |
OSWER Dir 9355.5-21FS |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ESAD |
OSWER 9355.5-21FS |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB95-963305 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
4 pages ; 28 cm |
Abstract |
The fact sheet presents an overview of a manual addressed to Remedial Project Managers (RPMs) that describes the predesign planning phase of the Superfund remedial process. The Guidance will also apply to Superfund Accelerated Cleanup Model (SACM) projects such as non-time-critical removals and non-emergency early actions. The Guidance provides information on managing Fund-lead and enforcement-lead sites; it includes a description of the required information collection activities, standard Remedial Design (RD) tasks, development of remediation schedules and cost estimates for remedial design, and instructions for preparing the Statement of Work (SOW). Throughout the manual, the varying responsibilities of the RPM and other parties are distinguished according to the type of project(i.e., Fund- or enforcement-lead). |
Notes |
Caption title. "OSWER Dir 9355.5-21FS." "PB95-963305." "EPA/540-F-95-008." "March 1995." Presents an overview of "Guidance for Scoping the Remedial Design," a manual addressed to RPMs that describes the predesign planning phase of the Superfund remedial process. |