Record Display for the EPA National Library Catalog

RECORD NUMBER: 26 OF 190

Main Title BESCORP soil washing system for lead battery site treatment : applications analysis report.
Author Gaire, R. J.
CORP Author Foster Wheeler Enviresponse, Inc., Livingston, NJ.;Environmental Protection Agency, Cincinnati, OH. Risk Reduction Engineering Lab.
Publisher U.S. Environmental Protection Agency, Center for Environmental Research Information,
Year Published 1995
Report Number 68-C9-0033;EPA/540/AR-93/503; EPA-68-C9-0033
Stock Number PB95-199741
OCLC Number 32289871
Subjects Soil remediation--Alaska ; Lead contamination--Alaska
Additional Subjects Soil pollution ; Electric batteries ; Lead(Metal) ; Superfund ; Heavy metals ; Washing ; Particle size ; Separation ; Hazardous materials ; Industrial wastes ; Performance evaluation ; Economic analysis ; Technology utilization ; SITE technology ; Soil washing system ; BSWS
Internet Access
Description Access URL
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=10001U60.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBD  EPA/540-AR-93-503 Headquarters Library/Washington,DC 03/11/2014
EJDD  EPA/540/AR-93/503 Env Science Center Library/Ft Meade,MD 05/12/1995
ELBD ARCHIVE EPA/540-AR-93-503 Received from HQ AWBERC Library/Cincinnati,OH 10/04/2023
ELBD  EPA 540-AR-93-503 AWBERC Library/Cincinnati,OH 01/01/1988
ESAD  EPA 540-AR-93-503 Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB95-199741 Some EPA libraries have a fiche copy filed under the call number shown. 07/26/2022
Collation xiii, 64 p. : ill. ; 28 cm.
Abstract
The Brice Environmental Services Corporation (BESCORP) Soil Washing System (BSWS) and its applicability in remediating lead-contaminated soil at lead battery sites was evaluated. The report presents performance and economic data, developed from the U.S. Environmental Protection Agency Superfund Innovative Technology Evaluation (SITE) demonstration (three test runs) and additional data provided by the developer. The demonstration took place at the Alaskan Battery Enterprises (ABE) site in Fairbanks, Alaska. Economic data for a commercial 20-tph unit processing wastes similar to those treated in the SITE Demonstration, including disposal of waste effluents, project operating costs to be about $165/ton of soil (dry basis) containing 6.6 wt percent moisture. This figure does not reflect any revenue from recycling of metallic lead or cashing chips.
Notes
"January 1995." "EPA/540/AR-93/503." "Contract no. 68-C9-0033 to Foster Wheeler Inviresponse, Inc." Includes bibliographical references.