Main Title |
Report on the Plant Evaluation at Fishing Bridge Wastewater Treatment Plant, Yellowstone National Park. |
Author |
Boe, Owen ;
Malloy., Leon ;
|
CORP Author |
Environmental Protection Agency, Denver, Colo. Region VIII. |
Year Published |
1977 |
Report Number |
EPA/908/3-77/005; |
Stock Number |
PB-278 177 |
Additional Subjects |
Activated sludge process ;
Sewage treatment ;
Performance evaluation ;
National parks ;
Design criteria ;
Nitrification ;
Process control ;
Flow charts ;
Lagoons(Ponds) ;
Oxidation ;
Clarification ;
Settling basins ;
pH ;
Alkalinity ;
Temperature ;
Dissolved gases ;
Oxygen ;
Recommendations ;
Colorado ;
Denitrification ;
Sewage treatment plants ;
Yellowstone National Park
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB-278 177 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
34p |
Abstract |
The National Park Service (NPS) has recently constructed several new wastewater treatment facilities at the Yellostone National Park. To ensure that their new facilities perform as expected, the superintendent of Yellowstone National Park requested assistance from the EPA to train park personnel in process control procedures and to provide performance evaluations of treatment facilities for the activated sludge and secondary treatment process. Specific technical assistance was requested for the nitrification-denitrification facility located at Fishing Bridge. Two weeks of troubleshooting on-site technical assistance was conducted and is described in the report. |