Main Title |
Superfund record of decision : Saltville Waste Disposal Ponds 5 and 6 (O.U. 2), VA. |
CORP Author |
United States. Environmental Protection Agency. |
Publisher |
[U.S. Environmental Protection Agency, Office of Emergency and Remedial Response] ; Reproduced by the National Technical Information Service, |
Year Published |
1996 |
Report Number |
EPA/ROD-R03-95-206 |
Stock Number |
PB95-963916 |
OCLC Number |
36215743 |
Subjects |
Hazardous waste sites--Virginia
|
Additional Subjects |
Superfund ;
Hazardous materials ;
Waste disposal ;
Water pollution control ;
Mercury(Metal) ;
Ground water ;
Capping ;
Substance drainage ;
Water pollution monitoring ;
Restrictions ;
Remedial action ;
Virginia ;
Record of Decision ;
Saltville(Virginia) ;
Smyth County(Virginia) ;
Volatile organic compounds ;
Cleanup
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EJAD |
EPA ROD/R03-95-206 |
HWTIC, 2 cys |
Region 3 Library/Philadelphia, PA |
04/11/1997 |
EJBD |
EPA ROD-R03-95-206 |
|
Headquarters Library/Washington,DC |
11/20/2014 |
ELBD ARCHIVE |
EPA ROD-R03-95-206 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ELBD |
EPA ROD-R03-95-206 |
|
AWBERC Library/Cincinnati,OH |
08/27/1999 |
NTIS |
PB95-963916 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
1 volume (various pagings) : illustrations ; 28 cm |
Abstract |
This Record of Decision ('ROD') presents the final remedial action selected for Operable Unit 2 (Pond 5 and Pond 6) of the Saltville Waste Disposal Ponds Superfund Site ('Site'), located in Saltville, Virginia. The selected remedy for the Pond 5 area consists of the following major components: Installation of a multi-layered cap over the entire Pond 5 area; Ground water interceptor system; Revision of the effluent discharge limit for the existing Pond 5 Treatment Facility to achieve the current Virginia surface water standard for mercury and any modification of the Pond 5 treatment Facility necessary to achieve the revised discharge limit; The selected remedy for Pond 6 and consists of the following components: A permeable soil cover over the entire Pond 6 area, approximately 40 to 45 arcres, including the demolition debris burial area; and A pH adjustment system to neutralize the discharge from the Pond 6 decant structure. |
Notes |
Cover title. "9/29/1995." "September 1995." "PB95-963916." "EPA/ROD-R03-95-206." |