Record Display for the EPA National Library Catalog

RECORD NUMBER: 26 OF 33

OLS Field Name OLS Field Data
Main Title Superfund explanation of significant differences for the record of decision : Idaho National Engineering Laboratory (USDOE), Pit 9 (OU 7-10), Idaho Falls, ID.
CORP Author United States. Environmental Protection Agency.
Publisher U.S. Environmental Protection Agency, Office of Emergency and Remedial Response] ; Reproduced by National Technical Information Service,
Year Published 1995
Report Number EPA/ESD/R10-95/118
Stock Number PB95-963145
OCLC Number 33202483
Subjects Hazardous waste sites--Idaho.
Additional Subjects Superfund ; Hazardous materials ; Waste disposal ; Pollution control ; Radioactive wastes ; Idaho National Engineering Laboratory ; Transuranium compounds ; Soil contamination ; Ground water ; Aquifers ; Land pollution ; Water pollution ; Radioactive waste management ; Remedial action ; Cost analysis ; Idaho ; ESD(Explanation of Significant Differences) ; Explanation of Significant Differences ; Record of Decision ; Idaho Falls(Idaho) ; Bonneville County(Idaho) ; Snake River Plain Aquifer ; Cleanup
Internet Access
Description Access URL
http://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=91001J4H.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EJBD ARCHIVE EPA ESD-R10-95-118 Headquarters Library/Washington,DC 11/24/2009
NTIS  PB95-963145 Most EPA libraries have a fiche copy filed under the call number shown. Check with individual libraries about paper copy. NTIS 01/01/1988
Collation [9] p. : ill. ; 28 cm.
Abstract
The document is an Explanation of Significant Differences (ESD) from the Record of Decision (ROD) for the Pit 9 Interim Action, signed by the United States Department of Energy, United States Environmental Protection Agency, and State of Idaho Department of Health and Welfare (the Agencies), effective October 1, 1993 (PB94-964615). This explanation addresses cost estimates that increased significantly for the selected remedy identified in the Pit 9 ROD and is implemented to present revised project cost estimates, including additional costs identified in the form fixed-price subcontract for the operations and maintenance and capital cost elements.
Notes
Cover title. "1/26/95." "PB95-963145." "EPA/ESD/R10-95/118." "August 1995." Produced by: U.S. Environmental Protection Agency, Office of Emergency and Remedial Response.