Record Display for the EPA National Library Catalog
RECORD NUMBER: 22 OF 75Main Title | Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, American Electric Power, Muskingum River Power Plant, Waterford, Ohio. | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
CORP Author | CHA, Albany, NY.; Lockheed Martin, Edison, NJ.; Environmental Protection Agency, Washington, DC. | |||||||||||
Year Published | 2009 | |||||||||||
Stock Number | PB2010-109964 | |||||||||||
Additional Subjects | CHA ; Site assessments ; Coal combustion surface impoundments ; Dam safety inspections ; Ohio ; Site visits ; Inventory ; Visual observations ; Containment dikes ; Muskingum River Power Plant ; American Electric Power ; Waterford(Ohio) | |||||||||||
Holdings |
|
|||||||||||
Collation | 181p | |||||||||||
Abstract | CHA was contracted by Lockheed Martin (a contractor to the United States Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of the Ash Reservoir Complex and the Units 1-4 Bottom Ash Pond. CHA made a site visit to the Muskingum River Power Plant on October 21, 2009 and October 22, 2009 to inventory coal combustion surface impoundments at the facility, perform visual observations of the containment dams and dikes, and collect relevant information. |