Main Title |
Alternative sewers - operation & maintenance : special evaluation project. |
Author |
Lopez, Ernesto.
|
Other Authors |
|
Publisher |
U.S. Environmental Protection Agency, Region 5, Municipal Facilities Branch, Technical Support Section, |
Year Published |
1989 |
Report Number |
EPA 905-R-89-106 |
OCLC Number |
496120814 |
Subjects |
Sewerage--Cost of operation ;
Sewerage--Maintenance and repair--Costs ;
Septic tanks--Cost of operation ;
Septic tanks--Maintenance and repair--Costs
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
ELBD ARCHIVE |
EPA 905-R-89-106 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
|
Collation |
16 leaves ; 28 cm. |
Notes |
Cover title. "Prepared by Ernesto Lopez, Thomas Poy, and Charles Pycha"--P. 7. "March, 1989"--Cover. Includes bibliographical references (leaf 8). |
Contents Notes |
"A Special Evaluation Project (SEP), completed in.August 1985 by Region V, analyzed the costs relating to the planning and construction of alternative conveyance systems (ACS) of 23 municipalities. That SEP established a comprehensive data base of the above costs which could be expanded to include operation and maintenance (0 & M) costs as projects then under construction reached the operation phase. This current SEP is a follow-up to the above study in that it examines aspects of the 0 & M of ACS. This study provides the general description of the ACS of the municipalities and the key management personnel, describes the tasks involved in their respective 0 & M programs, establishes an 0 & M cost data base, and identifies those problems which occurred during the construction and operation of the ACS. Data was collected from grant files, a site visit, and telephone and written responses. Key questions (pages 9 and 10) were developed in order to concentrate on specific 0 & M areas. These questions were sent out as a survey to 44 municipalities of which 40 have responded."--Introduction. |