RECORD NUMBER: 4 OF 16Main Title | Environmental Impact Statement: Henry W. Pirkey Power Plant Unit-I/South Hallsville Surface Lignite Mine Project, Harrison County, Texas. | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
CORP Author | Environmental Protection Agency, Dallas, TX. Region VI. | |||||||||||
Year Published | 1982 | |||||||||||
Report Number | EPA-906/9-82-011; | |||||||||||
Stock Number | PB83-120352 | |||||||||||
Additional Subjects | Electric power plants ; Surface mining ; Environmental impact statements-final ; Transmission lines ; Lignite ; Environmental impacts ; Overburden ; Construction ; Railroads ; Waste disposal ; Wildlife ; Vegetation ; Topography ; Texas ; H W Pirkey electric power plant ; Surface Lignite Mine project ; Harrison County(Texas) | |||||||||||
Holdings |
|
|||||||||||
Collation | 262p | |||||||||||
Abstract | Proposed projects include a 720 MW power plant, three 138 kv transmission lines, make-up water pipeline and railroad spur. The 272 acre plant island and 1,388 acre cooling reservoir have been cleared, the 100 acre railroad spur has been constructed as well as a portion of the 700 acre water pipeline. The lignite mine will cover about 20,771 acres of which about 10,545 acres will be impacted by mining. An average of 2.8 tons/year will be mined for 24 years. The reconstructed soil will consist of 6 inches of topsoil over a mixture of the remaining soil and the near-surface overburden. A minimum of 48 inches of cover will be provided over unoxidized overburden, and revegetation will use approved plant species. |