Record Display for the EPA National Library Catalog

RECORD NUMBER: 160 OF 800

OLS Field Name OLS Field Data
Main Title Cost estimating manual : combined sewer overflow storage and treatment /
Author Benjes, Henry H. ; Benjes, Jr., Henry H.
CORP Author Culp, Wesner, Culp--Clean Water Consultants, Eldorado Hills, Calif.;Municipal Environmental Research Lab., Cincinnati, Ohio. Wastewater Research Div.;Municipal Environmental Research Lab., Edison, N.J. Storm and Combined Sewer Section.
Publisher Municipal Environmental Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency ; National Technical Information Service,
Year Published 1976
Report Number EPA-600/2-76-286; EPA-68-03-2186
Stock Number PB-266 359
OCLC Number 03042080
Subjects Combined sewers--Costs.
Additional Subjects Combined sewers ; Cost analysis ; Manuals ; Overflows ; Water pollution ; Operating costs ; Storage ; Construction costs ; Maintenance management ; Sewage treatment ; Industrial plants ; Design criteria ; Capitalized costs ;
Internet Access
Description Access URL
http://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=300002BH.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EHAM  TD662.B45 Region 1 Library/Boston,MA 04/29/2016
EJAD  EPA 600/2-76-286 Region 3 Library/Philadelphia, PA 06/02/2000
EJBD ARCHIVE EPA 600-2-76-286 Headquarters Library/Washington,DC 01/11/2011
EJBD  EPA 600-2-76-286 Headquarters Library/Washington,DC 03/29/2016
ELBD  EPA 600-2-76-286 AWBERC Library/Cincinnati,OH 12/19/1997
ERAD  EPA 600/2-76-286 Region 9 Library/San Francisco,CA 09/17/2012
ESAD  EPA 600-2-76-286 Region 10 Library/Seattle,WA 03/23/2010
NTIS  PB-266 359 Most EPA libraries have a fiche copy filed under the call number shown. Check with individual libraries about paper copy. NTIS 06/23/1988
Collation x, 123 pages : illustrations ; 28 cm.
Abstract
Data for estimating average construction costs and operation and maintenance requirements are presented for combined sewer overflow treatment plants ranging from 5 to 200 million gallons per day in capacity, and storage facilities ranging in size from 1 to 240 million gallons. Estimating data are included for 14 separate process functions associated with stormwater treatment plants and storage facilities. An example of the use of the data is given. Estimated average construction costs and operation and maintenance requirements are related graphically to appropriate single parameters for respective plant components. In addition, cost components of the process functions are presented to enable inflating cost-related materials and wages. The data presented provides means of estimating costs and operating and maintenance requirements for a variety of facilities on an average basis, but do not supplant the need for detailed study of local conditions or recognition of changing design requirements in preparing estimates for specific applications.
Notes
"Contract no. 68-03-2186." Includes bibliographical references (pages 119-121).