Main Title |
MDC proposed sludge management plan, Metropolitan District Commission, Boston, Massachusetts : final environmental impact statement. |
Publisher |
The Region, |
Year Published |
1979 |
Report Number |
EPA 901-R-79-002; EPA 901-R-79-003; EPA 901-R-79-004 |
OCLC Number |
06128676 |
Subjects |
Sewage sludge ;
Sewage--Environmental aspects--Massachusetts--Boston Metropolitan Area ;
Water quality management--Massachusetts--Boston Metropolitan Area ;
Sewage sludge--Environmental aspects--Massachusetts--Boston ;
Sewage disposal in the ocean--Environmental aspects--Massachusetts--Boston ;
Sewage disposal plants--Massachusetts--Boston ;
Environmental impact statements--Massachusetts--Boston ;
Water--Pollution--Massachusetts--Boston Bay
|
Additional Subjects |
Massachusetts--Metropolitan District Commission
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EHAD |
EPA 901-R-79-002, 003 |
|
Region 1 Library/Boston,MA |
03/18/2013 |
ELBD ARCHIVE |
EPA 901-R-79-002 |
pt.A Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ELBD ARCHIVE |
EPA 901-R-79-003 |
pt.B v.2 Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ELBD ARCHIVE |
EPA 901-R-79-004 |
pt.B v.1 Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
|
Collation |
2 pts. in 3 volumes : illustrations, maps ; 28 cm |
Notes |
Pt. A prepared by U.S. Environmental Protection Agency, Region 1. Pt. B prepared for Region 1 by EcolSciences, Inc. Includes bibliographical references (Vol. 2, Appendix CC, pages 301-318). |
Contents Notes |
"This final environmental impact statement (EIS) evaluates a sludge management plan proposed by the Metropolitan District Commission (MDC) and examines other alternative systems; in an attempt to ensure the most environmentally sound and cost effective sludge management plan for the handling and disposal of primary sludge for the MDC system. Although the proposed project would involve 75% federal funding; the ultimate responsibility for implementing the selected sludge management plan lies with the MDC. The various alternatives analyzed and their environmental impacts are discussed in the EIS, and the selected alternative(s) identified. |