Main Title |
Cost estimates methodology for once-through cooling water discharge modifications / |
Author |
Hayden, John W.,
|
Other Authors |
|
CORP Author |
Acres American, Inc., Buffalo, N.Y.;Industrial Environmental Research Lab., Research Triangle Park, N.C. |
Publisher |
Environmental Protection Agency, Office of Energy, Minerals, and Industry, Industrial Environmental Research Laboratory ; For sale by the National Technical Information Service, |
Year Published |
1976 |
Report Number |
EPA 600-2-76-078; EPA-68-03-2053; EPA-ROAP-21AZU-021 |
Stock Number |
22161 |
OCLC Number |
03996754 |
ISBN |
pbk. |
Subjects |
Electric power-plants ;
Electric light plants
|
Additional Subjects |
Cooling water ;
Water pollution control ;
Industrial water ;
Thermal power plants ;
Cost engineering ;
Electric power plants ;
Construction ;
Earth handling equipment ;
Engineering ;
Cost analysis ;
Cost estimates ;
Design ;
Materials ;
Labor estimates ;
Installing ;
Once through cooling
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EKBD |
EPA-600/2-76-078 |
|
Research Triangle Park Library/RTP, NC |
06/27/2003 |
ELBD ARCHIVE |
EPA 600-2-76-078 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ERAD |
EPA 600/2-76-078 |
|
Region 9 Library/San Francisco,CA |
09/11/2012 |
ESAD |
EPA 600-2-76-078 |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB-251 663 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
xvi, 302 pages : illustrations ; 28 cm. |
Abstract |
The report gives a methodology for evaluating the engineering and cost implications of constructing or modifying once-through cooling water discharge systems of thermal-electric generating plants within the contiguous U.S. The procedures give (to persons not skilled in cost engineering) a means of preparing preliminary cost estimates from conceptual or design drawings. The user should, however, have a technical background and be familiar with once-through cooling water discharge systems. Principal construction elements of discharge system construction and modification are identified and grouped into categories. Materials and installation methods are discussed for each construction element. Data is given on labor, materials, equipment, and productivity assumed in unit cost development. A step-by-step procedure is given for: (1) estimating construction costs, and (2) resolving construction costs into project and annual costs. An example is shown using the methodology; the result is compared with actual construction costs for modifications to an existing discharge system. |
Notes |
Contract 68-03-2052, ROAP 21AZU-021, Program element 1BB-392. "EPA 600-2-76-078." "March 1976." Cover title. Includes bibliographical references. |