Main Title |
Future Municipal and Industrial Water Requirements Quality and Return Flow Aspects in the Neches, Trinity, San Jacinto, Brazos, Colorado, Guadalupe, San Antonio, and Nueces River Basins. |
CORP Author |
Public Health Service, Dallas, Tex. Region VII. |
Year Published |
1962 |
Report Number |
Work Assignment-33; |
Stock Number |
PB-217 764 |
Additional Subjects |
( Neches River Basin ;
Water pollution) ;
( Trinity River Basin ;
Water pollution) ;
( San Jacinto River Basin ;
Water pollution) ;
( Brazos River Basin ;
Water pollution) ;
( Colorado River Basin ;
Water pollution) ;
( Guadalupe River Basin ;
Water pollution) ;
( San Antonio River Basin ;
Water pollution) ;
( Nueces River Basin ;
Water pollution) ;
( Texas ;
Water pollution) ;
Forecasting ;
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
NTIS |
PB-217 764 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
125p |
Abstract |
The report describes the future quality of water for the year 2010 in the United States Study Commission - Texas area and determines the amounts of augmentation water required to maintain the water quality criteria adopted by the Commission. The report is to serve as a guide in determining and locating points and reaches in the eight river basins under study that may need water for water quality control. This report does not specify sources of water to be used for quality control. The study and analysis of the river basins and adjoining areas show a total need of 827,920 acre-feet of augmentation water to control the deficiency in dissolved oxygen. |