Record Display for the EPA National Library Catalog

RECORD NUMBER: 11 OF 31

OLS Field Name OLS Field Data
Main Title Interim guidelines and specifications for preparing quality assurance project plans /
Author Stanley, T. W.
Other Authors
Author Title of a Work
Verner, S. Sidney.
CORP Author Environmental Protection Agency, Washington, DC. Office of Exploratory Research.
Publisher Office of Monitoring Systems and Quality Assurance, U.S. Environmental Protection Agency,
Year Published 1983
Report Number EPA-600/4-83-004; QAMS-005/80; OER-QAMS-005/80
Stock Number PB83-170514
OCLC Number 10819048
Subjects Ecology--Research--Planning. ; Environmental protection--Research--Planning. ; Ecological research--Planning
Additional Subjects Quality control ; National government ; Operations ; Project management ; Planning ; Federal assistance programs ; Manuals ; Environmental Protection Agency
Internet Access
Description Access URL
http://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=910178NK.PDF
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=910178NK.PDF
Holdings
Library Call Number Additional Info Location Last
Modified
Checkout
Status
EHAM  QH51.S87 1983 Region 1 Library/Boston,MA 04/29/2016
EJBD ARCHIVE EPA 600-4-83-004 Headquarters Library/Washington,DC 10/31/2012
EJBD  EPA 600-4-83-004 Headquarters Library/Washington,DC 04/11/2014
EKAM  QH51.S87 1983 Region 4 Library/Atlanta,GA 11/25/1994
ELBD RPS EPA 600-4-83-004 repository copy AWBERC Library/Cincinnati,OH 12/08/2016
ESAD  EPA 600-4-83-004 Region 10 Library/Seattle,WA 09/27/2017
NTIS  PB83-170514 Most EPA libraries have a fiche copy filed under the call number shown. Check with individual libraries about paper copy. 01/01/1988
Collation v, 29 pages : illustrations
Abstract
The Agency-wide quality assurance policy stipulates that every monitoring and measurement project must have a written and approved Quality Assurance (QA) Project Plan. This applies to extra-mural as well as internal projects. All successful applicants for financial assistance must therefore prepare and submit a Quality Assurance Project Plan. This document describes the sixteen elements which must be considered for inclusion in all Quality Assurance Project Plans and establishes criteria for plan preparation, review, and approval. All project plans must describe procedures which will be used to document and report precision, accuracy, representativeness, comparability, and completeness of environmental measurements.
Notes
PB83-170514. EPA-600/4-83-004. QAMS-005/80. Includes bibliographical references (pages 25-26). Photocopy.