Main Title |
Pilot plant design for chemical desulfurization of coal / |
Author |
Van Nice, Les, ;
Van Nice, L. J. ;
Santy., M. J.
|
Other Authors |
|
CORP Author |
TRW Systems Group, Redondo Beach, Calif.;Industrial Environmental Research Lab., Research Triangle Park, N.C. |
Publisher |
Environmental Protection Agency, Office of Research and Development, Industrial Environmental Research Laboratory ; For sale by the National Technical Information Service, |
Year Published |
1977 |
Report Number |
EPA-600/2-78-080; EPA-600/2-77-080; EPA-68-02-1335; EPA-ROAP-21ADD-097 |
Stock Number |
PB-270 111 |
OCLC Number |
03995402 |
ISBN |
pbk. |
Subjects |
Coal preparation plants--Design and construction
|
Additional Subjects |
Desulfurization ;
Coal preparation ;
Pilot plants ;
Air pollution ;
Computer programs ;
Chemical reactors ;
Design criteria ;
Process charting ;
Performance evaluation ;
Sulfur ;
Air pollution abatement ;
Meyers process
|
Internet Access |
|
Holdings |
Library |
Call Number |
Additional Info |
Location |
Last Modified |
Checkout Status |
EKBD |
EPA-600/2-77-080 |
|
Research Triangle Park Library/RTP, NC |
06/20/2003 |
ELBD ARCHIVE |
EPA 600-2-78-080 |
Received from HQ |
AWBERC Library/Cincinnati,OH |
10/04/2023 |
ESAD |
EPA 600-2-77-080 |
|
Region 10 Library/Seattle,WA |
03/23/2010 |
NTIS |
PB-270 111 |
Some EPA libraries have a fiche copy filed under the call number shown. |
|
07/26/2022 |
|
Collation |
xii, 159 pages : illustrations ; 28 cm. |
Abstract |
The report gives results of a program for design and operational planning of facilities for testing the Meyers Process for chemical removal of pyritic sulfur from coal. Two options were evaluated: a complete pilot plant test of the process at a 0.5-ton per hour scale; and scale-up and testing of only the most critical portion of the process, the reactor and regenerator section (reactor testing unit). The report includes: a summary of background process data; a discussion of the pilot plant design; pilot plant start-up and operational test plans; and the preliminary design, start-up, and test approach for the reactor testing unit. It also includes: process flow diagrams for the complete pilot plant; pilot plant mass balance computer program; pilot plant plot plans and a sketch of the facility; complete pilot plant equipment list; critical path schedule for construction of the pilot plant; preliminary process flow diagrams for the reactor testing unit approach; preliminary reactor test unit plot plans and a sketch of the facility; and reactor test unit equipment list. |
Notes |
"April 1977." "Contract no. 68-02-1335; ROAP no. 21ADD-097; Program Element no. 1AB013." "EPA Project Officer: L. Lorenzi." |